As i read the messages which post by Ali Hamouda on 11.02.2002 band i still do not understand how to link my access data base to P3? because my Q.S using the M.Access to prepare the tender and directly the Resourses and production rates are already inside the files.
I want to transfer the resourse and production rates(mean UPT) to P3.
1)Can anyone tell me how to establish the link at OCBC step by step or where i can get these info?
2) How to link the access data base to P3?
I want to transfer the resourse and production rates(mean UPT) to P3.
1)Can anyone tell me how to establish the link at OCBC step by step or where i can get these info?
2) How to link the access data base to P3?