NEWS - One or two users are experiencing intermittent problems with Internet Explorer Version 10, if you have problems entering data, for now, please try a different browser. Sorry :(

Introduction

679
The Wiki is a knowledge-base that can be contributed to or utilized by anyone with skills and / or interest in planning, scheduling or project controls.

No Wiki page or article is owned by its creator or any other editor, and its content relies upon collaboration and teamwork.  How can you contribute?

Every Wiki page may be improved upon and edited by a logged-in Planning Planet commnity member.  Disclaimer / Read more...

Glossary

" (2) | 0 (7) | 3 (2) | 4 (2) | 5 (2) | 6 (1) | 7 (2) | A (24) | B (41) | C (77) | D (29) | E (25) | F (35) | G (13) | H (12) | I (17) | J (1) | K (4) | L (12) | M (23) | N (5) | O (12) | P (54) | Q (1) | R (37) | S (64) | T (38) | U (1) | V (4) | W (26) | Z (3)

Latest Posts

  • Pipeline Construction Pipe welding is not that straight forward.  You have a number of welding passes to take into consideration, then NDT and finally hydrotesting.  I worked on a pipeline construction project... mark jenkins 14-May-13
  • Forum Posting Rules & Issues Anyone can contribute to Discussion Forums.  You will need to join the site and / or a group in order to post a question to its Forum.Although the administrators and moderators of Planning... PP Admin 17-Apr-13
  • Flat and Layered Roofs Flat and Layered Roofs  roofing kensingtonTask / DescriptionSlow  Ave  Fast   Units Asphalt Roof in layers-  45.0 -   m2/day ... john dinkson 11-Apr-13
  • Finish to Start Vs Start to Finish Relations in Primavera Project Planner P6  Finish to Start:                This relation is the default relation in P6 i.e. if a relation is drawn within two... MQS S 30-Mar-13
  • Streamline communications to the Project Team One of the primary drives for Phoenix is to streamline the project management process.  The goal is to provide tools to focus the project team on delivering early versus struggling to build the... John Kunzier 24-Mar-13
  • Phoenix Project Manager Phoenix Project Manager is an easy to use construction project management system.  Phoenix helps project managers, schedulers and the rest of the project team streamline managing projects.... John Kunzier 24-Mar-13
  • Acumen Risk Cost and Schedule Risk Analysis tools don’t have to be complicated in order for them to provide true and accurate risk forecasts. Acumen offers Acumen Risk, a full-featured, easy-to-use cost and... PP Admin 08-Mar-13
  • BIM and Project Controls  I was reflecting this week on implementation barriers to BIG BIM. Building richness to your BIM data to allow all disciplines, and therefore ultimately the customer, to benefit, is a goal. '... Iain Cameron 10-Feb-13
  • Project Control in Construction for Mining Project ControlSchedulingCost Control Fredy Salazar 13-Jan-13
  • Introduction to Primavera 6 R8.1 (P6 R8.1) By the Introduction to P6 R8.1, we mean the basic understanding and procedures required to start up a new project in P6 R8.1. As we know that the P6 is one of the leading softwares in the world in... MQS S 06-Jan-13
  • Optimistic and Pessimistic Durations QUESTION Dear Mr Risk,I have populated my schedule with optimistic and pessimistic durations that sit around the durations assigned in our proposed baseline. We have run our analysis package and... PP Admin 14-Dec-12
  • Risk Registers or Schedule Analysis QUESTIONDear Mr Risk,We run intensive risk workshops every month where we run through an ever growing register of what might go wrong and form all sorts of aspects – quality, finance, war!,... PP Admin 14-Dec-12
  • Promotion of activity codes in Oracle Primavera P6 QUESTION Dear Mr P6 Civils,I know you can promote activity codes in P6.  What I want to know can you promote project codes to EPS codes and EPS codes to Global Codes or is it just promoting... PP Admin 14-Dec-12
  • Calendar for scheduling relationship lags QUESTION Dear Mr P6 Civils,When running our calculations in P6 8.2, we noticed that under schedule options, the calendar for scheduling relationship lags was set to Successor Activity Calendar.... PP Admin 14-Dec-12
  • EcoSys - EPC (Enterprise Planning & Controls) EcoSys EPC (Enterprise Planning & Controls) is a next generation planning and cost controls software solution delivering best practices for full lifecycle project cost management in an integrated... Adam Goldfarb 27-Nov-12

Market Place

Maxim Recruitment – Recruiting Construction, Engineering & Planning Professionals Worldwide in the Infrastructure, Rail, Building and Property Sectors.
Books and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself or run your own in-house or public planning courses.
The toolkit provides advanced analytical tools which can help identify areas of poor schedule quality at the click of a button.
Schedule Comparison Tool for P6 and MS Project. Change Happens. Manage it with Change Inspector
A comprehensive product suite with the flexibility to meet the varying needs of everyone involved in running projects