INSTRUMENTATION ENGINEER, ENER TECH LLP, OFFSHORE PROJECTS

START Date: 
March, 2011
END Date: 
May, 2012

Modification of the interfacing signals from the various devices and sub systems to the DCS, assigning terminals. Performing loop checks, functional checks for the various instruments and subsystems to the DCS.

  • Commissioning of Well head Hydraulic Control Panel, F & G System Controlled by Allen Bradley PLC With RS Logix 5000 System And Invensys Controls System.
  • All Types of Instrument fields such as: Assemble And Calibrations, Instalations and Commissioning precision instruments that measures, indicate, transmit, record and control.
  • Commissioning of some systems in B.M.S ( Boiler Burner Management Systems )
  • Performing internal function test and witness test.
  • Trouble shooting in process control loops, interlocks system, start up and shutdown logic  sequences        ( pumps , high pressure boiler, compressors)
  • Preparation of reports, long term trends and historical reports.
  • Commissioning of field instruments (transmitters, RTD, thermocouples, gauges, switches, motor operated valves, pneumatic valves, Control valves)
  • Displacer Type level instruments of various make like FISHER & FOXBORO &  ROSEMOUNT & MEGNETROL & ULTRASONIC Level Transmitters Calibrations. 
  • Control Valves and Shutdown valves of make FISHER & ABB & BIFFI Valves calibrations.
  • Fire And Gas Instruments like a H2S GAS DETECTORS Calibrations make ICARE  &   HONEYWELL.
  • ROTOR MOV Valves Calibrations.
  • Prepare daily and weekly construction report, as applicable.
  • HART & F.F All field instruments <?xml:namespace prefix = st1 />LAB Calibrations & FIELD Calibration.
  • Good Knowledge of Well Head Control Panel and Hydraulic Power Unit
  • Calibration and Loop checking of all type F&G Detectors. Like H2s, Combustible, Hydrogen Hit and Smoke Detectors.
  • Knowledge in SCADA (Siemens), DCS (Foxboro, Rosemount, Yokogawa) and PLC like   Functional test, Cause effect checking.I was a permit holder there I was regular in my duty etc.
  • Supervision of installation, inspection, calibration, loop checking, site acceptance test, check sheet clearance through WINPCS And AMS(Automated Completions System) system punch list sign off, As-built preparations, site modification as required at site condition, discuss & finalize with clients changes required at site, finalizing FCN. Co-ordination with vendor representative for special Inst./system checking/commissioning. ESD/F&G system modification/ start up loop by loop transfer. Co-ordination with client kick off meeting, monthly progress review meeting, close out report hand over as built documents/drawings, survey changes, field changes / spares etc.