Project Controls Engineer

Project Controls Engineer, Transpower, Wairakei C

START Date: 
July, 2012

Implementation of earned value and quantitative risk management processes. Fine tuning of existing cost sontrol processes. Input into set up of contractual payment schedules. 

Project Controls Engineer, Turner Construction - International, marassi

START Date: 
May, 2010

-          Directly responsible for the planning structure of the Project.

-          Reviews and Approves baseline schedules for awarded packages.

-          Works closely with the Client in establishing short programs for summer target and end of year target.

Project Controls Engineer, Dubai Supply Authority (DUSUP), 1) 48” x 1 off GAS & 24” x 2 off DFO - Hassyan Pipelines, 2) 48” RING MAIN-2 PIPELINE, 3) GAS CONTROL STATION UPGRADE PROJECT 4) Black Powder Project

START Date: 
July, 2006
  • Lead all the planning, scheduling, estimating and cost control activities related to projects.
  • Monitor Contractor’s schedule & performance, reports, cost estimates for variations.
  • Negotiate costs for variation scopes with contractors.
  • Preparation of Project Cost estimates/budgets, Cost Control reports & Project Schedules.
  • Allocate and manage Cost codes required for the projects.
  • Prepare Weekly & Monthly Reports and submit to the Management for review and update the reports periodically.
  • Preparation of the Detaile

Project Controls Engineer, Iberdrola Engineering&Construction, Several Projects

START Date: 
August, 2003
END Date: 
May, 2005

Project Controls Engineer. Main projects and functions:

 CCGT Castellón 4 (850 MW, €350 M): Project Controls Engineer.

 BCC Tunisia (T&D, €30 M): Project Controls Engineer based in Tunis.

CCGT Santurtzi (400 MW, €200 M): Owner Cost Control Engineer.

Schedule preparation  or Thermal Generation Power Plants proposals.

Project Controls Engineer, Bencov Group, Clean Energy, MANUFACTURING, Oil %26 Gas FEED's

START Date: 
January, 2006

Jan 2007 – Sep 2009          Project Controls Engineer – Bencov Group Ltd

Project Controls Engineer, Mohammad Al Mojil Group, Berri Gas Plant HPDGA and SRU expansion

START Date: 
May, 1998
END Date: 
May, 2000

 

§  Prepare and update detailed work schedules for some of the project’s critical activities like System Pressure Testing Schedule and Plant Shutdown Piping Tie-In Schedule using the Primavera Project Planner.

§  Monitor, quantify and report the work accomplishments, manpower and expended man-hours in my area of responsibility

§  Quantity take-off for progress reporting and billing purposes

Project Controls Engineer, Sellafield Ltd (formerly BNGrp/BNFL), Substation Replacement Project

START Date: 
February, 2005

I have experience of the full Project Controls service. Providing a planning role on a Substation replacement project, progressing own schedule and monitoring a contractors schedule.

Aslo have responsibilitiy for maintaing costs within budgeted limits. On a mnothly basis produce reports detailing Year to date BCWP / EAC and forecast BCWP / EAC for the financial year and the lifetime of the project.

Project Controls Engineer, Banu Mukhtar Contracting (Pvt.) Limited, Buildings & Infrastructures, COMMERCIAL & RESIDENTIAL BUILDINGS, Mixed use development, Multiple Projects ; Oil & Gas

START Date: 
September, 2009
END Date: 
April, 2012
  • Construction Planning and Scheduling (Resource & Cost Loaded Master Schedules) using PRIMAVERA 6 & MS PROJECT 2010
  • Identification, monitoring& streamlining of critical paths running through the Project Schedule.
  • Using Earned Value Calculations to monitor project status.
  • Analysing Trends and development of early warning system.
  • Developing Budgets that lead to the establishment of a cost/schedule baseline.
  • Resource and cost management using MS PROJECT & PRIMAVERA.
  • Contractual correspondence

Project Controls Engineer, Toledo Arabia, Taif Baha Water Transmission System

START Date: 
March, 2011

 

Ø  Preparation of budget.

Ø  Preparation and Analysis of Detailed Schedules, Progress and Cash Flow Curves, Delays, Impacts & Claims.

Ø  Advising the management and client on critical issues, potential delays, claims and time impacts.

Ø  Preparation and follow up of Extension of Time & Cost Claims for contracting company.

Ø  As part of Project Management Organization, preparation of Evaluation Report and recommendation for contractor’s Extension of Time & Cost Claims.

Project Controls Engineer, Balfour Beatty Civil Engineering, T2B Heathrow

START Date: 
June, 2011
END Date: 
April, 2013

06/2011 – Present           Balfour Beatty Major Civil Engineering -               Project Controls Engineer: Fit Out

Balfour Beatty Group is constructing Heathrow Terminal 2B as part of the reconstruction of Terminal 2 which has been demolished. The Terminal 2 project consists of 3 phases A, B & C of which I am employed on Phase B as part of the Project Controls team which consists of 5 Engineers.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content