Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

scheduling

SENIOR PLANNER, Adyard Abu Dhabi, Multiple Refinery Capital and Maintenence Projects

START Date: 
January, 2009
Ø  Identification of job volume, criticalness, material requirements, rigging requirement & Pre-T/A arrangement through site visit and scope studies.
Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
8800

SENIOR PLANNER, Adyard Abu Dhabi, Multiple Refinery Capital and Maintenence Projects

START Date: 
January, 2009
Ø  Identification of job volume, criticalness, material requirements, rigging requirement & Pre-T/A arrangement through site visit and scope studies.
Experience Hours (Planning & Scheduling): 
40000
Experience Hours (Cost Management): 
8800

Project Controls Manager, Orascom Construction, Abu-Rawash Waster water Treatment Plant, Grand Heights Infrastructure & Villas Works, MARS Egypt site development

START Date: 
November, 2015

Project Controls Manager:

 

1.      Head, lead and manage a team of project controls and planners worked on site.

2.      Reporting directly to Managing director, unit’s director and project controls director.

3.      Assess, hire project controls and set the staff schedule.

Experience Hours (Planning & Scheduling): 
32150
Experience Hours (Cost Management): 
15350
Experience Hours (Forensic Analysis): 
11900

PLANNING ENGINEER, Gulf Contracting Co WLL, Doha Festival City & Le Mirage Downtown

START Date: 
March, 2014
END Date: 
October, 2017
Project: Le Mirage Downtown (4B+G+M+10+Tech+PH) Mixed Use Building (Contract value: Qar 190 Million
Location: Doha, Qatar)Preparation of resource and cost loaded fidic clause 14 baseline schedule and getting it approved from client.
Updating the programme as per the progress at site, preparation of recovery schedules.
Preparation of Extension of time Claim by Time impact analysis.
critical path analysis of schedule at progress reporting. Various reports – DPR, WPR, MPR (preparation and
tracking).
Experience Hours (Planning & Scheduling): 
5500
Experience Hours (Cost Management): 
1500
Experience Hours (Forensic Analysis): 
500

Principal Project Services, BHP Billiton, Escondida Mass Mining Method (MMM)

START Date: 
November, 2016
END Date: 
November, 2017
Provide project services support (estimation, budget control scheduling and planning) for theprojects such as Mass Mining Method (MMM), Escondida Water Recovery and TailingManagement (EWRTM), EWR (Escondida Water recovery demo plant) and other as IPR memberfor review the governance accomplish for estimation and scheduling
Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500

Estimator and project controls engineer, KTI - Technip, Multiple Projects / Petrochemical ; Oil and Gas / EPC Project Controls

START Date: 
September, 1994
END Date: 
September, 1998

Estimator and project controls engineer (cost and schedule) on petrochemical projects worldwide

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
8000

Owner Pre-bid Project Schedules, Project Inspection, JVG Engineering, Ella Expansion, Kirkwood Bridge and Extension, N. MacGregor Storn Sewer Relief, Lyons Expansion and Hazardous Abatement

START Date: 
October, 2002
END Date: 
November, 2004

Contract Civil Inspector, Primavera Scheduling

§  Contract civil inspection for SJRA online WW treatment plant expansion tripling capacity

§  Primavera CPM scheduling for Houston PW&E for 5 ‘difficult’ projects

§  ‘Get Vic over there’ contract inspection at problem projects for Houston PW&E

Experience Hours (Planning & Scheduling): 
200
Experience Hours (Cost Management): 
0
Experience Hours (Forensic Analysis): 
50

TAR Planning and Scheduling Lead, BP, BP Oil Refinery Turnarounds

START Date: 
January, 2014
  • Manage TAR Planners and Planning Coordinators to drive consistency and adherence to BP Guidelines in planning and planning processes.
  • Leading TAR SAP implementation, training refinery personnel ongoing.
  • Created, Revised and Standardized documents for TAR Planning and Scheduling
    • TAR Scope Development and Optimization Guideline, Work package creation guidelines, file storage guidelines, standardized field planning forms, Scheduling Guideline, EWO procedures and forms.
  • Schedule the Contract Planners and Contract Schedulers and provide oversight.
Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
7500
Experience Hours (Forensic Analysis): 
2500

Assistant project engineer, Growell Hr solution Pvt. Ltd and Xeam Ventures pvt ltd. on behalf of MECON LIMITED, 2.5 MTPA exansion project of SAIL-ISP ,Burnpur

START Date: 
August, 2010

 I am involve in the 2.5 MTPA expansion project of SAIL -ISP ,Burnpur since concept stage  to    post commissioning   and looking after the following 

Design sepuer vision.

Project planning and monitoring ,

Scheduling

Estimation of Cost

Teaming  resources and Analysis

Resouce leveling

Tracking  progress

Reporting 

 Meeting with client and contractor

Experience Hours (Planning & Scheduling): 
10000
Experience Hours (Cost Management): 
10000

Engagement manager, Milestone Consultants, Airports, Commercial Construction, Rail

START Date: 
June, 1997

Consulting in planning, scheduling and controls of engineering and construction projects.  Built a consulting organization to provide services to the industry (Owners, A/E firms, GC's and speciality contractors)

Experience Hours (Planning & Scheduling): 
12000
Experience Hours (Cost Management): 
5000
Experience Hours (Forensic Analysis): 
3000

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content