Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

scheduling

Manager - Planning, Sunway Construction, Rihan Heights - Phase 1A

START Date: 
April, 2012

Plans, administers and coordinates multiple, complex advance/special projects; organizes and employs resources to achieve project objectives; prepares and monitors project budgets.

 

•         Develop, oversee and seek continuous improvement of the Works' Planning program

•         Assist in the development of works templates

Manager - Planning, Sunway Construction, Rihan Heights - Phase 1A

START Date: 
April, 2012

Plans, administers and coordinates multiple, complex advance/special projects; organizes and employs resources to achieve project objectives; prepares and monitors project budgets.

 

•         Develop, oversee and seek continuous improvement of the Works' Planning program

•         Assist in the development of works templates

Civil construction planning engineer, DinSons Constructors.Engineers, Projects Under USAID

START Date: 
October, 2010

I am Working as Planning Engineer in DinSons Constructors.Engineers Since 2010 .

Area of Responcibility is to make work Shedule , set mile stone and tracking them periodically as meet the targets and project goals.

Plannning Engineer, Saudi Oger, Al-Samriyah Farm, Development of King Abdullah Road

START Date: 
October, 2008
END Date: 
April, 2012

PRESENT JOB (country- Saudi Arabia) :

 

  • Working as a Planning Engineer  for Saudi Oger Ltd.  for the construction of “Al-Samriyah Farm” at Aamriyah, Riyadh from Oct.2010 till date.

 

  •  Worked with Planning Team in Head Office Riyadh for various projects “Bidding Proposal” from Jan 2010 to Sep. 2010.

 

Senior Project Engineer, Balfour Beatty Power Networks Ltd, Various Masts & Towers Projects

START Date: 
March, 1992
END Date: 
October, 2004
  • Consistent progression of experience from student engineer to senior project engineer, across various operational departments, including design, within Balfour Beatty Power Networks Ltd.
  • Personally progressed the development, costing and trial of an innovative concept in the strengthening of tubular legged towers in partnership with a blue-chip client.
  • Instigated and created the Department’s overall planning programme.
  • Created generic, and specific work procedures and risk assessments. Produced the original RF (Radio Frequency) Policy for BBPNL.

Chief of Planning Dept., ERC - Emirates Roads Contracting Co. L.L.C. (Hamarain & Al Dheeb), All Company Projects

START Date: 
March, 2006

 

Responsibilities:

·         Report to Construction Manager.

·         Assist to establish an enterprise overall management system and set the required system modifications in the company system in order to integrate the planning section activities with the company departments.

Senior Planning Engineer, Shimizu, Taisei, SK E&C, Mass Rapit Transit Project - Construction of Station and Tunnel

START Date: 
August, 2006

CAREER HISTORY

1)  SK E&C (Singapore Branch)

     (Downtown Line MRT Stage 3 Contract 930 – Singapore)

      Contract Value – SGD 106.7 millions

     Planning Engineer / Scheduler (May 2011 – Present)                                 &nb

Senior Planning Engineer, Shimizu, Taisei, SK E&C, Mass Rapit Transit Project - Construction of Station and Tunnel

START Date: 
March, 2012

CAREER HISTORY

1)  SK E&C (Singapore Branch)

     (Downtown Line MRT Stage 3 Contract 930 – Singapore)

      Contract Value – SGD 106.7 millions

     Planning Engineer / Scheduler (May 2011 – Present)                                 &nb

Senior Planning Engineer, Shimizu, Taisei, SK E&C, Mass Rapit Transit Project - Construction of Station and Tunnel

START Date: 
March, 2012

CAREER HISTORY

1)  SK E&C (Singapore Branch)

     (Downtown Line MRT Stage 3 Contract 930 – Singapore)

      Contract Value – SGD 106.7 millions

     Planning Engineer / Scheduler (May 2011 – Present)                                 &nb

Scheduling Engineer, HICAPS, Calvary Methodist Church

START Date: 
November, 2001
END Date: 
April, 2003

Working with the Contractor and subcontractors facilitated the development of the baseline construction schedule using planning information. Provided bi-weekly updates and summary narrative reports detailing the longest/critical driving paths, performance analyses, suggestions to improve and/or avoid potential impacts for immediate timeframe and projected timeframe.  

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content