planning

Planning Engineer, AMEC Power & Process Europe, West Burton 'B' CCGT Power Station

START Date: 
January, 2009
END Date: 
September, 2011

Development of Primavera P3 construction programme,

Earned Value Reporting

Programme Re-baselines

Production of weekly/monthly reports for client

Planning Engineer / Project Coordinator, Murr Group, “Cap Sur Ville” Residential and Recreational Project, Lebanon. The project comprised 3 high-rise buildings (34 floors above ground and 2 basements each) with a height of 120 m, 18 buildings of 7 floors

START Date: 
January, 1994
END Date: 
August, 1995

Duties include ensuring that work is progressed as scheduled by identifying trends for management attention and by taking early prevention measures; reviewing the strategy of work submitted by the construction team of the various sections and adjusting the schedule to suit work constraints and open fronted areas; monitoring and reviewing the periodically project updated schedule; site coordinating between various trades and coordinating schedule variances; identifying delay and slippage, and providing recommendations for performance improvement and/or corrective

Section Engineer - External Works, Consolidated Contractors Company CCC / HOCHTIEF (JV), Rafic Hariri/Beirut International Airport Rehabilitation and Extension

START Date: 
August, 1995
END Date: 
August, 1997

Duties include preparing reinforced concrete shop drawings and the related bar bending schedules; designing pre-cast elements for terminal buildings and got Dar Al-Handasah approval; supervising concrete works in Utility Tunnel, Terminal Building New Elevated Arrival/Departure Bridge, infrastructure works related to electrical airfield lighting for the new East and West Runways with their taxiways; supervising turnkey construction of two electrical substations and concertina fencing on top of Boundary Walls; handing over the Elevated Water Tank, Civil Aviation P

Lead Planner and Buildings Manager, Consolidated Contractors Company CCC / Bechtel (Consortium), Saudi ARAMCO Gas Pipeline Project and SAFCO (Saudi Arabia Fertiliser Co.) 2nd Urea/Ammonia Plant Project - Jubail - Kingdom of Saudi Arabia.

START Date: 
August, 1997
END Date: 
August, 1999

Duties include preparing Primavera schedule of works for all related works detailed to Level 3, loaded with budgeted cost; updating schedule of works on weekly basis together with the status of materials; preparing cost control reports after verification of cost codes, comparing with BOQ prices, checking variations; responsible for quality and procurement of all civil permanent material; guided all architecture and civil shop drawings related to 12,000 m².

Deputy Project Manager, Consolidated Contractors Company CCC / SAIPEM-ENI Group (Consortium), Karachaganak Main Works , Power Plant Complex, Temporary Camp and Construction of 13 km Road Projects, Aksai, Kazakhstan

START Date: 
August, 1999
END Date: 
August, 2002

Duties include controlling earthworks and civil concrete activities, introducing and monitoring Russian/Kazakh equipment which were an added values in this new area; supervising buildings’ architectural finishes, all electromechanical systems, wall and roof insulated cladding, steel structure and fireproofing activities; overcoming numerous challenges and difficulties in redesignin

Construction Analyst/Project Scheduler, ecoseed, 1.Construction of Multistoried Buildings

START Date: 
December, 2008

a  p6 trainer  at  " AMIES it  academy   & cellection academy  and   MYACADEMY " for management 
 feasibility studies trainer  at MY academy 
 planning  instructor at my academy 
risk management  instructor   at My academy 

Senior Research Engineer, National Engineering Design Development Institute, Reverse Engineering of Motorcycle Parts

START Date: 
April, 2011

Design, Fabrication, Simulation and Modeling of Machine Parts, Reverse Engineering of Motorcycle parts, Research and Development. Planning, Scheduling, Estimation, Costing and Budgeting

Technical Manager Project Controls, Kvaerner, Numerous Projects worldwide

START Date: 
July, 2010
END Date: 
July, 2012
  • Technical Manager responsible for support of proposals development and support in planning/scheduling, estimating and progress reporting for Business Development in Houston Texas. Implement and train personnel in planning and scheduling utilizing Primavera version 3 conversions to Primavera Version 6.
Experience Hours (Planning & Scheduling): 
5100
Experience Hours (Forensic Analysis): 
600

Lead Planner and Scheduler, Aker Solutions, Staatsolie Oil Refinery Expansion

START Date: 
July, 2010
END Date: 
August, 2011

Lead Planner and Scheduler for Aker Solutions on Sutrinamese State Oil refinery expansion prject. Responsible planning, risk management, EVM, chnage control, procedures and training