planning

Senior Planning Engineer / Cost Engineer, ABB Global Engineering AS (Norway), Phillips Petroleum Frame Agreement - Ekofisk and Surrounding Platforms

START Date: 
March, 1992
END Date: 
December, 1992

Responsible for planning, cost control and reporting for the frame agreement with Phillips Petroleum Company Norway. This frame agreement comprised ongoing maintenance of the Ekofisk complex and associated platforms.

Senior Planning Engineer, International Petroleum Corporation Ltd, Dubai, Bukha Field Development Project

START Date: 
January, 1993
END Date: 
February, 1993

Responsible for preparing a master plan for the Bukha field development project, and subsequent training of local staff to update/maintain the plan.  Project comprised development of the Bukha 1 and 2 wells, and onshore modifications to the existing Rakgas facilities.

Senior Planning Engineer, McConnell Dowell Middle East Ltd, Hawtah to Pumping Station Number 3 Pipieline Project

START Date: 
March, 1993
END Date: 
December, 1993

Responsible for the planning and reporting of the Hawtah to pumping station no. 3 project.

Project comprised the construction of 340km of 24” pipeline, 20 valve stations, and a pig launching and receiving facility.

Project Controls Manager, Global Engineering / Fluor Daniel JV, Shell Claus Offgas Treatment (SCOT) Project

START Date: 
December, 1993
END Date: 
December, 1994

Responsible for capital cost control and construction planning for the Shell Claus Offgas Treatment Project (SCOT) at the New Zealand Refining Company.

Work included detailed planning for three sulphur recovery unit shutdowns, along with detailed planning and cost control for the construction of the new SCOT Unit, and tie-ins to existing plant.

Senior Planning Engineer, Sun Metals Corporation, Townsville, Townsville Zinc Refinery Project

START Date: 
September, 1997
END Date: 
October, 1999

Responsible for construction planning for the Townsville Zinc Refinery Project.

Work included controlling the construction planning and reporting of the 26 contracts associated with the construction of the AUD 530 Million Refinery on behalf of Korea Zinc.

Senior Planning Engineer, Transfield Ltd., Eastern Gas Pipeline Project

START Date: 
October, 1999
END Date: 
September, 2000

Seconded to the TWM Joint Venture.

Responsible for the detailed construction planning for the AUD 160 Million Eastern Gas pipeline.

Project comprised the construction of 792km of 18” pipeline, 16 valve stations, and 4 scraper facilities.

Senior Planning Engineer, Chevron Oil Services, Brisbane, Papua New Guinea to Brisbane Pipeline Project

START Date: 
September, 2000
END Date: 
December, 2000

Responsible for the preliminary planning of the Papua New Guinea to Brisbane pipeline project. The AUD 3.4b Project was in the process of obtaining the required customer base prior to entering Front End Engineering and Design, when it was put on hold.

Senior Planning Engineer., Willbros Engineering International, Chad to Cameroon Pipeline Project

START Date: 
December, 2000
END Date: 
April, 2003

Seconded to the Willbros Spie Capag Joint Venture.

Responsible for detailed construction planning for the Chad to Cameroon pipeline project.                                                Project comprised the construction of 1071 km of 30” pipeline, 48 valve stations, 3 pump stations and a pressure reduction station.

Project Controls Manager, Willbros Engineering International, Houston, ERHA Deepwater Project

START Date: 
April, 2003
END Date: 
December, 2003

Responsible for all Project Controls activities related to the ERHA Deepwater Development Project.

The ERHA Deepwater Project consisted of the fabrication and SIT testing of several deepwater manifolds.

PLANNING ENGINEER, FNC Dubai, Factory Buildings, Industrial Structures

START Date: 
October, 1998
END Date: 
January, 2004

 

5¼Years As Planning Engineer With FNC Construction Dubai.

A Dubai Based Civil & Pre-engineered Building Contractor With Projects All Over U.A.E.

Projects, Program Managed Includes:

·         Industrial Structures, Factories.

·         Luxury Villas & Clustered Villa Projects,

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.