Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

planning

Zone Manager, Public ShipYard, Ships Overhaul

START Date: 
August, 2005
END Date: 
August, 2012

I plan and execute complex overhaul work onboard ships.  This includes tracking and managing men, material, and money required to execute.  I am also required to ensure conformance to requiremnets.

Zone Manager, Public ShipYard, Ships Overhaul

START Date: 
August, 2005
END Date: 
August, 2012

I plan and execute complex overhaul work onboard ships.  This includes tracking and managing men, material, and money required to execute.  I am also required to ensure conformance to requiremnets.

Dy. Planning Manager, C & C Constructions Ltd, Various 2/4/6 laning NationalhIGHWAYS pROJECTS

START Date: 
June, 2005
END Date: 
October, 2008
  • Preparation of Detailed Project Budget at Pre Contract as well as Post Contract Stage considering each and every items of the BOQ.
  • Preparation of Monthly Cash flow for various highway Projects.
  • Preparation of Pre-qualification and Post-qualification Documents.
  • Working of Quantities for BOT Projects.
  • Preparation of Construction Programme at Pre Contract Stage.
  • Reviewing & maintaining the status of Bank Guarantees regarding to the Contract.
  • Preparation of Joint Venture Agreement, Co-ordination with Co./JV Partners, Corresp

Resident Engineer (Planning), Valecha Engineering ltd, Construction of Grade Seperator and allied works Retaining Walls, Service Roads,

START Date: 
November, 2008
END Date: 
December, 2009
  • Preparation of Construction Programme, Budget & Cash Flow Projection.
  • Monitor the progress of work against base line schedule in coordination with the construction team and suggesting corrective action to reduce schedule and cost variance.
  • Working out Actual Quantities as per the Cross sectional details given in the drawings.
  • Preparation/Collation of Daily / Weekly / Monthly Progress reports.
  • Co-ordination with site Engineers for collection & monitoring the various data’s regarding progress Aspects.
  • Weekly / Fortnightly / Mont

Sr. Manager (Project Monitoring & Control), Jindal Group, New Delhi, India, Water Infrastructure Projects, Cross Country Pipe line Projects for Power Plants,

START Date: 
July, 2012

 

 

  • Preparation of Construction Programme for various types of Water Treatment, Waste Water Treatment Projects on BOT basis.
  • Preparation of Weekly/ Monthly work programmes.
  • Preparation of Comprehensive Time Phased Budget thorough Schedule Planning and cost loading against each activity.
  • Determine specific work progress on the project in detail and Capturing actual cost incurred on the project.
  • Perform Variance Analysis on the resultant Earned Value Data to measure performance against the approved Project Baseline.

Planning Manager or Project Controls Manager, Turner and Townsend UK, Heathrow T2

START Date: 
June, 2012
END Date: 
September, 2013

Heathrow Airport Terminal 2 (Concourse, Airside and Multistorey Carpark) ICS Planning and Coordination

Cost & Planning Manager, MABCO, petrokyemia housing jubail Industrial city

START Date: 
October, 1986
END Date: 
September, 1988

Manufacturing and Building Company in Riyadh KSA Pre-cast concrete manufacturing plant in Riyad and Dammam

Project Control Apprentice, Siemens PLC Metals UK, Various / Training

START Date: 
September, 2007
END Date: 
September, 2009

I was a part of the first group of dedicated Project Control Apprentices to undertake the apprenticeship which was created in the north east of England between Siemens PLC Metals UK, AMEC, Aker Kvaerner (Now Jacobs), K Home Engineering and Alpha +. The training was provided on the job and also by NETA (North East Training Agencies), Darlington Technical College and Teesside University. 

 

Planning Engineer, ConocoPhillips Indonesia, Letang Tengah Rawa Optimization Project

START Date: 
September, 2011

As Planning Engineer with responsibility :
- Update Primavera P6 Schedule and Risk Register
- Review Contractor schedule, progress and report
- Provide overall planning, scheduling and progress reporting structure for Projects Management Team
- Liaise and coordinate planning information
- Provide planning and scheduling support during the development of bid documents and evaluations
- Advice to Project Management Team regarding all aspects of Planning, scheduling and progress reporting

Mine Surveyor and Planner, Ironton Mining (pvt) Ltd, Zimbabwe, Numerous

START Date: 
April, 2003
END Date: 
May, 2006

Developing a solid foundation of skills through comprehensive training as a Mine Surveyor and Planner

Gaining exposure to mine planning and design, development of project organisation and production progress measurement

Responsible for training three assistants and for coordinating meetings with managers and team leaders

Utilising strong planning and organisation skills to create reports and schedules, for direct use in problem resolution

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content