Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

planning

Lead Planner and Package Planner, Black & Veatch, Kusile Power Station

START Date: 
October, 2009
END Date: 
December, 2011

Current Role - Package Planner on Eskom Kusile Power Station in South Africa.  Employed by Black & Veatch.  Project consists of 6x800MW coal-fired units and all BOP elements on a green field site.

Interfaces with Construction and Commercial management staff and with the Controls and Instrumentation contractor.  Reviews contractor programmes, providing feedback to contractor and reporting status to Project.  Develops and inputs logic and status updates for Project Master Programme.  Provides reports and analysis for Project and corporate management.&

Planner/Senior Planner/ Claims Planner, RSV Enco (Sasol Projects), Sasol Impumelelo Project

START Date: 
August, 2008

Current Role

 

1. Civil Engineering Schedules

- Roads

- Overland Conveyor Earthworks

- Terraces

- Bridges

- Dams

- Water Crossings

- Reservoirs

 

2. Master Schedule Management (civils, electrical, mechanical & mining integrated)

- R5 billion contract value

- Interface management between contractors

- Managing claim mitigations

- Servitude interfacing (to minimise claim and standing time risk)

Project Planner, CL Shiprepairers and Builders, Commercial and Navy Vessels

START Date: 
February, 2012

 

 

 

  • Progress Monitoring on refit specs
  •  

     

     

     

     

     

  • Update progress status and spec cancellation
  •  

     

     

     

     

     

  • Planned Vessel Milestone and targets
  • &nb

    EPC Lead Planner, SNC Lavalin, O&G

    START Date: 
    June, 2006

    Current Role: Lead planner for the construction division

    Responsibilities:

    • Establish, maintain and improve planning procedures
    • Assign to the planners tasks and responsibilities
    • Diffuse proven planning methods to planners

    Senior Planning and Scheduling Engineer, Small Orange Solutions, Multiple - Consulting Planner

    START Date: 
    May, 2000
    END Date: 
    July, 2015

    Lead the development and execution of the company's strategy.  Assure that the appropriate control methods are in place, in order to fulfill our customers and associates needs.  Be the public communicator between the company and the community.

    Experience Hours (Planning & Scheduling): 
    24000
    Experience Hours (Cost Management): 
    3000
    Experience Hours (Forensic Analysis): 
    3000

    Planning Engineer, Tengizchevroil, Industrial Cnstruction projects

    START Date: 
    August, 2007
    END Date: 
    June, 2009

    Roles / Responsibilities / Achievements:

     

    • Developed an integrated (Engineering, Code Compliance/ Permitting, Procurement and Construction) Level 4 Primavera Schedule with milestone dates, precedents and durations established through workshops and meetings with Project Management team including Project Engineer, Construction Manager, Procurement manager, Laboratory consultant and design discipline leads.
    • Worked closely with the multi-discipline team to develop a Level 5 tracking t

    Seniot Project Control Engineer, Petronas, PFK Project, Ampa Fairley Rationalization Project, Thar Jath Development Project

    START Date: 
    April, 1995
    END Date: 
    May, 2008
    Responsibilities included providing capital project support featuring leadership, expertise and tools for project goals and deliveries, project management, risk assessment, technical and feasibility studies, work-scoping and engineering studies for the research and technologies division of the international corporation.
    Experience Hours (Planning & Scheduling): 
    28000
    Experience Hours (Cost Management): 
    5000
    Experience Hours (Forensic Analysis): 
    100

    PLANNING ENGINEER, Laing O Rourke UK, Crossrail - (C430) Farringdon Enabling Works (including 3 years Tender Planning)

    START Date: 
    April, 2007
    END Date: 
    April, 2012

    This role with LOR commenced in the Tender Office at Dartford. During this time I working onthe following bids:

    1) Kingsnorth Coal Fired Power Station (Enabling & Main Civils) £100M+

    2) Hinkley Nuclear Power Station (Enabling & Mainworks) £200m+

    3) Kings Cross Western Range (Kings X Station) £75m+

    4) Crossrail Packages (Enabling & Main Works) £100m+

    5) Bond Street Station Upgrade £100m+

    6) Blackpool Tram System & Depot £40m

    Experience Hours (Planning & Scheduling): 
    10000
    Experience Hours (Cost Management): 
    2000
    Experience Hours (Forensic Analysis): 
    1000

    Assitant Manager, Assistant Engineer - Planning & Project Control, PMC projects (i) Pvt Limited, Development of Multi Cargo Port Terminal at Hazira

    START Date: 
    September, 2006

    Construction planning using MSP, Primavera & automated excel sheets to monitor & control the project. Project management for improved execution also part of KRA

    Senior Lecturer, Southampton Solent University, Building, Construction IT, Roads and bridges

    START Date: 
    December, 2007

    Senior Lecturer (Construction Management) delivering Project Management, Strategic Construction Management, Building as a Product including Operations Research, Health and safety in construction units.

    Market Place