Planning Lead, Shell Petroleum Development Company of Nigeria, SODA/ DomGas Project

START Date: 
March, 2011
END Date: 
November, 2012

I have been engaged in planning for 21 years dealing with production through multi disciplinary projects, from inception through commissioning. My career has progressed from the shop floor (Boilermaker) to the current post of Planning Lead. Experience has been gained in production, power generation, process plant, petro-chemical, aluminium smelting, breweries, Copper mining, covering all disciplines. Currently I form part of the Owners team, based in Warri, Nigeria. Present project portfolio totals some US $5 Billion, ranging from Flow stations through to Central Processing Plants.

Sr. Planning Engineer, Saudi Oger Ltd., Pension Fund Office Building (Dabbab Towers) Riyadh K.S.A $ 150 Millions

START Date: 
August, 2005
END Date: 
February, 2008

Planning     Monitoring      Controlling    &     TIA    (Time Impact Analysis)

Loop Check Coordinator, JGC Singapore Pte , Dung Quat Refinery

START Date: 
May, 2008
END Date: 
June, 2008

Contracted as Loop Check Co-ordinator on Petrovietnam's Dung Quat Refinery project. Implemented processes for the management of Project Issues and Actions using a web-based database tool. Role as Loop Check Co-ordinator involved liaison between management teams of 5 zones in Project site. Implemented a deliverables tracking system for Loops, Devices, Plant Systems and Plant Areas.

Software Systems Manager, Vetco Gray, Bonga Field Development (Shell)

START Date: 
April, 2005
END Date: 
December, 2005

Contracted to implement management processes for the control of project deliverables to achieve a crucial deadline on Shell's, Bonga Project (Nigeria). System comprised Wonderware InSql, InTouch and InControl within a system of 12 networked industrial PCs and 30 paired Subsea Control Modules. 

Programme / Project Coordinator, London Underground Limited, LUL Connect Project

START Date: 
December, 2002
END Date: 
August, 2003

Working within the LUL Connect Project Delivery team to ensure effective implementation of station enabling works for integration of Radio services into the entire London Underground railway infrastructure. Work involved top down monitoring of work completions together with problem-solving and control of issues at the implementation level, to ensure contractors’ compliance with stringent LUL processes and procedures for access, method-statementing, deviation issues and certification. 

Planner / Project Manager, Marconi, Jubilee Line Extension

START Date: 
June, 1999
END Date: 
August, 2000

Controlled simultaneously several projects within the London Underground Jubilee Line Extension Project including installation and inspection of Public Address System equipment, development of a fault analysis/maintenance monitoring and control system and Radio Communications System equipment. 

Compilation of method statements, obtaining of access permissions and work completion certification documents for work in station control rooms, equipment rooms and other non-public areas.

Design and Commissioning Engineer, ICS Triplex, Numerous Projects worldwide

START Date: 
September, 1990
END Date: 
January, 1998

The role involved site survey, feasibility study, management of installation and commissioning, client liaison on both technical and commercial issues. 

As a systems trouble shooter work involved management of a wide range of situations both in technical and in business settings. Wide variation of experience gained mostly on short duration, problem projects, which resulted in a series of successful outcomes. 

PLANNING ENGINEER, INPEX Corporation, Abadi (Masela) FLNG Project

START Date: 
August, 2010

Nine (9) years of experience in preparing and monitoring schedules for Offshore/Onshore Gas Pipeline EPC Projects, Offshore Platforms FEED/DED Projects, Civil Works Projects and identifying the time/duration and resources required to complete the projects.

Experience gained over the years includes:

• Prepare Schedules (Level 1~3) using Project Management Software i.e.

Planning and Project Control, Chiyoda Corporation, Larsen & Toubro Limited, Pipeline including Terminals, Process Plants, SVs and Wellhead Projects

START Date: 
July, 2002

EDUCATION:

Post Graduate Diploma in Project Engineering and Management, NICMAR, India (Jul, 2005 - Mar, 2007)

Bachelor of Technology in Electrical Engineering, Dr. R.M.L. University, India (Jul, 1998 - Jun, 2002)

 

CAREER YEARS: 7.5 Yrs. + 2 Yrs. Post graduate Diploma in Project Engineering and Management

CAREER SUMMARY / PROFILE:

Project Controls Section Manager, BNFL, Various Nuclear Projwects

START Date: 
January, 2000
END Date: 
June, 2001

Employed by Project Services Group as the Project Control Section Manager responsible for a specific part of the BNFL Engineering business including Thorp, Magnox, MOX & Transport. Duties include overall responsibility of ensuring a team of 16 people provided the depth of cost engineering & planning services required by various project managers within BNFL.

Experience Hours (Planning & Scheduling): 
1200
Experience Hours (Cost Management): 
1200