Assistant Planning Engineer, Elecon Engineering co. ltd- INDIA, Power Transmission Division

START Date: 
May, 2004
END Date: 
November, 2006

From elevators, conveyors and gears to material handling plants. For over 5 decades, Elecon has supplied hi-tech equipment to major core sectors such as steel, fertilisers, cement , coal, lignite and iron ore mines, Sugar, power stations and port mechanization in India and abroad. (www.elecon.com)

Planning, Scheduling, Expediting and Project Coordination in Power Transmission Division

Civil Planning Engineer (Civil, CBRE, Aircraft Hangar for Maintenance, Repair and Overhaul (MRO) of Boeing Airplanes

START Date: 
July, 2011

 

Project Undertaken: Maintenance, Repair and Overhaul Facility for Air India at Nagpur.The project consists of building an MRO Facility having an Aircraft Hangar consisting of 2 bays for Boeing Airplanes and other small airplanes, Apron, Energy Block, Hangar Back Shop, Electrical Substation and other facilities etc.

 Key Responsibilities:

Fleet Planning Engineer ( & Planning support), British Airways Engineering, Aircraft Maintenance

START Date: 
January, 1989
END Date: 
September, 2006

 

1989 – 2006             British Airways Engineering

1989- 1997               Aircraft Technician 

1997 – 1998             Zone Co-ordinator

Section Engineer / Planner, Carillion, Canary Wharf Station

START Date: 
February, 1998
END Date: 
January, 2000

Section enginner and planner responsible for close out and handover of Canary Wharf Station on the Jubilee Line Extension

Site Enigneer, Carillion, Canary Wharf Station, Jubilee Line Extension

START Date: 
November, 1995
END Date: 
December, 1996

Site Engineer - Structures, Canary Wharf Station, Jubilee Line Extension.  Responsible for Concrete Slab construction at all levels of the Station

planning manager, Mace UK, heathrow terminal 1 east extension

START Date: 
May, 2001
END Date: 
May, 2004

Planning manager at Heathrow Airport for extension to the baggage hall. I was responsible for planning and co-ordinating the building works with the M&E installation and the Baggage Installation.

Planning Manager, Bovis Lend Lease, various

START Date: 
June, 2004
END Date: 
February, 2007

Planning Manager for Central London Office Developments including refurbishment of existing offices and new build on brown field sites

Planning Manager, UK Power Networks Ltd, SSR

START Date: 
July, 2011

As a Project Planning Manager I am responsible for the planning and monitoring of Sub Surface Railway Upgrade M&E projects of London Underground on behalf of UK Power Networks (EDF Energy).

Principal Responsibilities:

  • Prepare Plans for new and upgrade of Substation construction works.
  • Prepare plans for track side High Voltage cable installation works.
  • Provide support & guidance in all Planning Management Activities
  • Analysing planning & control requirements for the programme of works
  • Developing procedures for use of t

planning and project control manager, PT. Tripatra Engineers and Constructors, Concept, FEED, Detail Engineering & Procurement Services for Offshore Platform, Pipeline & Onshore Plant

START Date: 
April, 1996

More than fifteen (15) years experience in Project Management, Construction Management, Project Scheduling, Cost Control and Project Reporting for Engineering Procurement Construction Commissioning Project (EPCC) and Engineering Project. The experience includes: Prepared of Master, Detailed and Integrated EPCC schedules. Prepared of manpower planning for Engineering, Procurement, Construction, and Pre-commissioning / Commissioning. Projected completion dates and monitored progress toward milestones.

Controls and Budgeting Senior Engineer, Saudi Aramco, Bechtel, Hill International, Worleyparsons, European Community, MZ & Partners, A variety of oil and gas and engineering projects.

START Date: 
August, 1978
END Date: 
November, 2011

 

  • Project Site Engineer (Worleyparsons, Saudi Arabia), (2009-2011) $680 Million Ras Az Zawr

 

Reviewed and approved port design including 5 berths, 22 buildings, wastewater treatment plant, desalination plant, 5 substations, 10 kilometers of road, security systems etc..

 

Supervised construction of the above-mentioned scope of work including quality control, safety implementation and cost and schedule control.

 

Assignments:

 

Familiarized

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.