PLANNING ENGINEER

Planning Engineer, AL ARABIA ELECTROMECHANICAL LLC JUMA AL MAJID GROUP, MARINA RESIDENCE, DUBAI WHARF, TECOM HOTEL

START Date: 
April, 2014
END Date: 
June, 2015

In the capacity of the Planning Engineer, I have been delivering the following tasks by leading Project Planning & Control in multiple projects. I solely handle key issues when necessary.

Experience Hours (Planning & Scheduling): 
1950
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
500

Planning Engineer, Laing O’Rourke Construction Hong Kong Limited, Express Rail Link (XRL) Contract 810B - West Kowloon Terminus Station South

START Date: 
January, 2012
END Date: 
March, 2013
  • Provided reports regularly to Top Management and Client.
  • Planned, developed and maintained schedules and associated resources.
  • Updated Project Controls Report for company-wide integrated Project Controls System.
  • Performedprogramme analysis and scenario studies to design changes, construction sequences, resources requirement, productivity rates, logistics planning and procurement.
  • Organized and facilitated planning sessions with project teams for schedule variances that impact milestone key dates and concluded remedial action plans.
  • Monitored crit
Experience Hours (Planning & Scheduling): 
2500

PLANNING ENGINEER, BIZVILLE PROJECT MANAGEMENT, De-Bottlenecking Project For Energia/Oando Ebendo Marginal Oilfield (Client: Exxon Mobil)

START Date: 
September, 2012
END Date: 
May, 2015

*Create new Schedule/Plan by importing Project Plan to Primavera & Ms Project 

Experience Hours (Planning & Scheduling): 
3500
Experience Hours (Cost Management): 
3500

Planning Engineer, YOKOGAWA Middle East Co. B.S.C, Fadhili Gas Program Package -1, 2 & 3

START Date: 
November, 2016

1. Development of Baseline Plan (level 3) using software Primavera (P6).

2. Preparation of level 4 plan for Monitoring progress and assigning responsibilities.

3. Detail Resource Estimation based on standard productivity norms

4. Resource loading in Primavera (P6) plan

5. Preparation of Weekly, Monthly & Two weeks lookahead to schedule.

6. updating actual progress and all related information & comparison analysis. 

7. Preparation of recovery plans

8. Preparation of direct and indirect mobilization schedule.

Experience Hours (Planning & Scheduling): 
4000
Experience Hours (Cost Management): 
2000
Experience Hours (Forensic Analysis): 
2000

Planning Engineer, SAIPEM TAQA ALRUSHAID FABRICATORS, EPC

START Date: 
January, 2012
END Date: 
August, 2015

 

Experience Hours (Planning & Scheduling): 
7350
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
2000

Planning Engineer, ELSEWEDY POWER SYSTEM PROJECTS, Stiegler's Gorge Hydro-power dam

START Date: 
July, 2018

- Preparing Project Baseline Schedule.

Planning Engineer, ELSEWEDY POWER SYSTEM PROJECTS, Stiegler's Gorge Hydro-power dam

START Date: 
July, 2018

- Preparing Project Baseline Schedule.

Configuration Planner, Material Planner, Planning Engineer, Project Controls Manager, CFW PRECISION METAL COMPONENTS, Aircraft Interior manufacturing

START Date: 
March, 2012

Material Planner: 

  • Analyzed and ordered all required material while utilizing beneficial purchasing techniques (order policies, period orders, etc.) with respect to inventory turns, cost, and lead times.
  • Initiated and implemented facility wide processes which successfully lowered inventory while decreasing shortages on the production floor. Order policies, Period orders, safety stock , etc…

Configuration Planner:

Experience Hours (Planning & Scheduling): 
14000
Experience Hours (Cost Management): 
8000

Planning Engineer, Larsen & Toubro (L & T) Limited, Doha Metro Project

START Date: 
July, 2014
END Date: 
November, 2016

Project Planning, Monitoring and Controlling.

Primavera P6 Scheduling, Preparing Extension of Time, Delay Analysis.

Planning Engineer, Rotary Engineering Limited, Evonik Me6 Project, Proposed Petroleum Storage & Handling Facilities for Jurong Port Terminals (Phase 1), SRC Mogas Cogen Project, Afton LION Project

START Date: 
May, 2015
END Date: 
September, 2018
  • Develop and update project schedule using Primavera P6 during tender and execution phase
Experience Hours (Planning & Scheduling): 
6800