PLANNING ENGINEER

Planning Engineer, Atkins, Dubai Metro

START Date: 
October, 2005
END Date: 
February, 2009
  • Planning and controlling civil design undertaken by ATKINS of both lines of Dubai Metro including utility diversions, viaducts, tunnels, stations, 3 depots, and associated E&M works .

Planning Engineer, Wade Adams, Tendering and controll

START Date: 
February, 2005
END Date: 
February, 2007

•            Preparing project execution program as specified in the Conditions of Contract (Clause 14).

•             Preparing Internal Programs for execution of works.

•             Monitoring progress and updating weekly progress.

•             Preparing projections of plant, material & labour.

PLANNING ENGINEER, Malaysia Marine & Heavy Engineering, Magtymguly Platforms Fabrication

START Date: 
May, 2005
END Date: 
November, 2005

Involve directly in planning, scheduling, monitoring of activities in Engineering, Procurement, and Fabrication yard, and all activities progress with the objective of completion a project

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Forensic Analysis): 
1000

Planning Engineer, Doosan Babcock, Various

START Date: 
July, 2003
END Date: 
December, 2010

I completed a 2 year structured training programme as Trainee Planner before progressing to the position of Planning Engineer. Most of my time with the company was spent as a Shutdown / Project Planner at site, preparing programmes from scratch and also integrating and managing subcontractor programmes where required. I was also involved in site supervision, proposals, procurement, and logistics at different times.

Planning Engineer, Reliance Engineering Associates Pvt. Ltd., QYI Crude, VMP FCC, JERP Crude, Gas Cracker SD, FCC SD

START Date: 
May, 2003
END Date: 
October, 2010

Career History

 

Reliance Engineering Associates (P) Ltd.

Manager (Since May 2005)

 

Projects Handled

 

From Jul 2010 – till date

 

Planning for FCC SD jobs.

 

From Apr 2010 – Jun 2010

 

Planning for Gas Cracker SD jobs.

 

From Jan 2009 – Mar 2010

Planning engineer, IMCO Company, EPIC for the Replacement of Turbine Control Panels, Fire & Gas and Emergency Shutdown Systems @ Fahahil Stripping Plant Dukhan Fields-Dukhan,State of Qatar.

START Date: 
May, 2005
END Date: 
February, 2006
  • Planning and Developing Baseline Schedules
  • Reviewing and finalizing the project baseline schedule and progress measurement system.
  • Resource loading.
Experience Hours (Planning & Scheduling): 
1300
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
300

PLANNING ENGINEER, ExxonMobil, Kearl Oil Sand Project

START Date: 
January, 1993

Lead Planning/ Project Controls Engineer –

KEARL Oil Sands Project (Calgary, Canada - Current Assignment from Aug 2010)

Point Thomson Project (California, USA – from Jan 2009 to July 2010)

PLANNING ENGINEER, Al Ahmadiah Aktor, Jabel Ali Sewage Treatment Plant Project

START Date: 
April, 2006
END Date: 
August, 2010

Scope Analysis & Preparation of Time Schedules as part of Tender submission for new Projects

including Projected Resource Profiles (Manpower & Plant) and Cash Flow profiles.

Worked on the AED 1.5 billion Jabel Ali Sewage Treatment Plant Project as the Main Project Planner

Planning Engineer, Parsons De Leuw Cather Overseas Ltd., Dubai Metro, Palm Jumeirah Gateway Bridge, Construction of Interchange 4.0.4.5.4.75,5.5.5 ,Emirates Road Widening, Sheikh Zayed Road Widening, Floating Bridge, Ras Al Khor Improvements, Business Bay

START Date: 
September, 2004
END Date: 
April, 2007

Preparing the Time Impact Analysis for Contractors,

Preparing Delay notifications,

Forensic Analysis using different methods like As Planned Impact Analysis, As Build Impact Analysis. Window Analysis

Preparing the Claim Programmes, Reviewing the Claim Programme.

Preparing Claim Documents i.e. Claim write ups organizing the claim in order of events.

Planning Engineer, Fluor Kuwait Company (formerly Fluor International Ltd.) / Kuwait, Projects Management Consultancy Project (PMC) for Kuwait Oil Company (KOC)

START Date: 
December, 2004
END Date: 
September, 2009


December, 2004 to September, 2009  

Employer          : Fluor Kuwait Company (formerly Fluor International Ltd.) / Kuwait

                         Project Management Consultants (PMC) to Major Projects Group, KOC          