1.    Daewoo Eng’g. & Const. (Dec2013-Dec2014), Seoul, South Korea

 

An internationally recognized EPC company that specializes in Civil Engineering Works, Architectural, Plants and Housing Projects.

 

Civil Engineer

Central Area Field Complex (CAFC) Algeria Project – Oil and Gas

 

A.      Review contract and FEED documents and coordinate with engineering and construction team to prepare the procedure, work method statement and specifications for submittal to the client.

B.      Assisting the Construction and Project Control Manager in various tasks assigned.

 

2.    Gulf Consult (June2011–July2013), Al-Khobar, Kingdom of Saudi Arabia

 

A company with expertise in Geotechnical Investigation, Material Testing, Environmental Assessment and Surveying Services.

 

Proposal Engineer (Geotechnical)

 

A.      In charge in preparing technical and commercial proposals/quotations and cost estimation for Geotechnical Investigation Services and in some cases for Topographic Survey

·         Receive a request for proposal

·         Send Acknowledgement letter (fax or email)

·         Check whether company is interested to bid by making a Yes or No decision (after consulting supervisor)

·         Preliminary Analysis of the request for proposal

·         Preparation and addressing of Pre-bid clarifications

·         Attending job explanation or clarification meetings and/or communicating (by email or telephone) with the clients regarding the subject request for proposal (if any)

·         Thorough and methodological analysis of the request for proposal (reviewing Scope of work, Specifications, Instruction to Bidders, Applicable Drawings/Plans)

·         Schedule preparation of proposal based on the other jobs on hand and due date of the RFP

·         Develop the design for the proposal program (Introduction, Scope of Work, Schedule of Work, Budgeting, Deliverables, Project Organization, Time Schedule, Terms and Conditions, Deviations)

·         Preparing Cost Estimation

·         Preparing Bar Chart Schedule, Method Statement, Job Safety Analysis and other Prequalification Documents (if needed for the bid submittal)

·         Discuss with BD Manager & General Manager the proposal and obtain approval before submission to the client

·         Present the proposal to the prospective client (fax, email or sealed bid package)

·         Follow up for the status of the bid/s submitted

·         Address post bid clarifications (if any)

B.      Assist the Business Development Manager in reviewing & finalizing contracts.

C.      Be aware of the market changes and identify upcoming opportunities for the Company.

D.      Takes full responsibilities for conversions of various cost elements in the preliminary budget revisions in case of contract award & forward to project management department after compilation through BD Manager.

 

Projects Awarded:

 

CTCI Arabia Ltd.

·      Drilling and Installation of Twenty-One GW Monitoring Well For Sabtank Area for IR-II U&O DBN Project/Yanbu

 

Worley Parsons

·      Geotechnical Investigation for Upgrade Power Supply at Marjan GOSP’s Project/ Safaniyah Gas Plant

 

Saudi Arabian Baytur Const. Company

·      Geotechnical Investigation For Rabigh-II Non-Process Buildings Project/Rabigh

 

Sinopec Ningbo Engineering Ltd.

·      Geotechnical Investigation & Topographic Survey for Petrokemya Power Expansion Project/Jubail

 

Al Rashid Trading & Contracting Co. Ltd. (RTCC)

·      Geotechnical Investigation for Proposed Maritime Tower Projects in Eastern & Western Regions Under Boarder Guard Development Program/Various Locations

 

·      Geotechnical Investigation for Al Rashid Towers/Al-Khobar

 

·      Geotechnical Investigation for Proposed Construction of Azzebnah Training Center for SIE Border Project Near Half Moon Bay Area/Al-Khobar

 

SOFCON

·      Geotechnical Investigation Services for Front-End Engineering Design (FEED) for Al Bayroni Power Downstream Enhancement Project (APDEP)

 

Manazel Construction Company

·      Geotechnical Investigation for Construction of Bachelor Housing Phase-2, Masjid Al-Rabee & Dhahran Mosque Extension/Dhahran

 

Mustang Al-Hejailan Dar Pi

·      Geotechnical Investigation for Home Ownership Lots Development Project/Dammam

 

·      Geotechnical Investigation for Shoaiba Refined Product Distribution Facilities/Shoaiba

 

·      Geotechnical Investigation for Additional Compressor Facilities/ Safaniyah Gas Plant

 

·      Geotechnical Investigation Services for Proposed Shaybah Crude Stabilization Project/Abqaiq Plants

 

·      Geotechnical Investigation for Hex Shop Enclosure and A/C Project/ Juaymah

 

 

Technimont Arabia Ltd.

·      Geotechnical Investigation &Topographic Survey for the Proposed HDPE Pilot Plant/Jubail

 

Radicon-Gulf Consult

·      Geotechnical Investigation and Concrete Coring for the Evaluation of Old Fouda School/Abqaiq

 

SNC Lavalin Arabia, LLC

·      Geotechnical Investigation for Jubail Railway & SADARA Rail Project/Jubail

 

NSH & Gulf Asia Contracting LLC (Al Hajri)

·      Drilling and Installation of Four (4) Groundwater Monitoring Wells For Tasnee/Sap Project/Jubail

 

GS Engineering

Geotechnical Investigation and Topographic Survey for Rabigh Phase-II Petrochemical Project (CP3, CP4 and UO1)/Rabigh

 

STX Heavy Industrial Co. Ltd.

·      Geotechnical Investigation & Topographic Survey for SADARA Oxygen & Nitrogen Supply Project/Jubail

 

Kil Jin Kang & Partner Const. Cont. Co., Ltd. (KCC)

·      Drilling and Installation of Two (2) Groundwater Monitoring Wells for Sipchem EA-Plant22 Project/Jubail

 

Daelim Industrial Co. Ltd.

·      Geotechnical Investigation & Topographic Survey For Proposed ACN Nacn FEED Project/Jubail

 

·      Geotechnical Investigation & Topographic Survey for Butanol & Syngas Project @ Tasnee Complex/Jubail

 

Petrofac Saudi Arabia

·      Geotechnical Investigation for Rabigh Phase-II Petrochemical Project (UO2 and UO3)/Jazan

 

·      Geotechnical Investigation for Jazan Refinery & Terminal Project-North Tank Farm & Loading Arms Facilities and South Tank Farm Facilities/Rabigh

 

Samsung Engineering

·      Geotechnical Investigation for Riyadh Clean Transportation Fuel Project/Riyadh Refinery

 

 

 

 

 

3.    Benami Construction Company Inc. (June2010-June2011), Cavite, Philippines

 

An established construction company with numerous government building and road projects.

 

Junior Engineer

 

A.      Assisting the project engineer in managing the site construction works.

B.      Responsible for monitoring and estimating the materials needed in the site.

C.      Prepare the purchase request and obtain approval from project engineer and project manager to submit in the purchasing department for PO.

D.      Receive and check the materials delivered at the site.

E.      Prepare the time sheets of the manpower and other staffs in the site.

Professional Since: 
May-2010 (14.0 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.