START Date:
January, 2019
END Date:
January, 2020 Responsibilities:
- Analysed approved Baseline Schedule (both program & narrative) integrity based on contract agreement, issued for construction documents (specification & drawings), approved method statement and governing construction standards.
- Analysed existing Progress Reports (both program & narrative) integrity based on its consistency of actual dates, agreed productivity rate and manner deployment of resources.
- Analysed Delay Events by collecting all related documents to be able to determine a strong factual storyline in preparation for corresponding fragnet that shall be use in impacting approved Baseline Schedule.
- Prepare delay analysis to determine time impact on Baseline Schedule and corresponding narrative that shall be use as part of Extension of Time or EOT evaluation.
- Prepare an As-Built Schedule with documented references such correspondence, progress reports, register logs, inspection, information request, drawings, meeting minutes and all project documents.
- Supervise and lead Consultants in the process of schedule forensic analysis including method gathering information as factual basis for delay event fragnet development.
- Attend Planning and Delay Coordination meetings in behalf of the Client to discussed disposition based on factual references or evidence leading to disruption of the project.
Project Involved:
- Arabtec – Tiara Union Tower Project (Dubai)
- Arabtec – Media City Project (Dubai)
- SRG – Al Zour LNG Import Project (Kuwait)
- Cleveland Bridge – Conference & Exhibition Center at Expo 2020 (Dubai)
- Cleveland Bridge – Metrolink Station Expolink Route 2020 (Dubai)
- BAM – Museum of the Future (Dubai)
Experience Hours (Planning & Scheduling):
1950
Experience Hours (Cost Management):
1950
Experience Hours (Forensic Analysis):
1950