Hello
I would like to solicit advice on preferred progress Measurement technique in P6. Pros and cons of physical vs duration etc.
Would it.make sense to build resources loaded schedule (labor non labor) if the duration is 15 months.
Which method would be preferred over another if you have resources loaded in The schedule.