Hello,
I need to allocate a lump sum cost to some tasks of the project, and have 100 percent of the cost showing at the very beginning of the task. Can anybody help?
Alexandre
Hello,
I need to allocate a lump sum cost to some tasks of the project, and have 100 percent of the cost showing at the very beginning of the task. Can anybody help?
Alexandre