Hello everyone,
Since we reach the 90% of the building works, some of our big boss tells us that "perhaps we don´t need to shcedule the rest of the works til the end"
Personally i think that its completely the opposite, NOW is when we need to know where we are and wich are our targets to manage our time in the right way. Perhaps as a stakeholder I cannot see the truth
Can I be wrong? why don´t anyone tell me (us) some exit work wich near scheduling (or not..)
Thx a lot
Since we reach the 90% of the building works, some of our big boss tells us that "perhaps we don´t need to shcedule the rest of the works til the end"
Personally i think that its completely the opposite, NOW is when we need to know where we are and wich are our targets to manage our time in the right way. Perhaps as a stakeholder I cannot see the truth
Can I be wrong? why don´t anyone tell me (us) some exit work wich near scheduling (or not..)
Thx a lot