Hi All,
As a Planning Engineer, Do i have to include in my job listing the tools, office supply, water tank and other things needed for the mobilization? Are you doing it? and if the sub-contractor had given you their schedules, Do i really have to modify and shorten it, or just follow their schedules and push them afterwards.(if their schedule is delayed)
Note: by the way, we are the main contractor.
Thanks
Rick
As a Planning Engineer, Do i have to include in my job listing the tools, office supply, water tank and other things needed for the mobilization? Are you doing it? and if the sub-contractor had given you their schedules, Do i really have to modify and shorten it, or just follow their schedules and push them afterwards.(if their schedule is delayed)
Note: by the way, we are the main contractor.
Thanks
Rick