TO Level 1 Planners,
Does anyone have information about benchmarking schedule data (CHEMICAL field).
CONSTRUCTION : Duration estimate for a polymers plant with following features:
CAP; 150000 ton/yr . Two lines.
Output is: POM (polyoxymethylene flakes).
Thanks,
carmen
Does anyone have information about benchmarking schedule data (CHEMICAL field).
CONSTRUCTION : Duration estimate for a polymers plant with following features:
CAP; 150000 ton/yr . Two lines.
Output is: POM (polyoxymethylene flakes).
Thanks,
carmen