Hi there,
I use Primavera 3.1 primarily and have to help another planner (trainee) to draw up an s-curve, but she uses Suretrack 3.0.Normally I use Tabular Reports||Resource||Loading to do the report for excel(Resources spread over timeperiod). How would I do that in Suretrack? I have never used Suretrack before and I am having some trouble in getting the report we need for the s-curve.
Any help would be appreciated. Thank you guys in advance.
I use Primavera 3.1 primarily and have to help another planner (trainee) to draw up an s-curve, but she uses Suretrack 3.0.Normally I use Tabular Reports||Resource||Loading to do the report for excel(Resources spread over timeperiod). How would I do that in Suretrack? I have never used Suretrack before and I am having some trouble in getting the report we need for the s-curve.
Any help would be appreciated. Thank you guys in advance.