Presently I’m working with project management team for the as a planning engineer.
The cost of the project is one Billion US$, So far I have intensively involved in the progress that is site evaluating, monitoring and reporting. Project’s construction program being resources and cost loaded. Recently our client interested to measure the earn value through the P3, I have not so much idea how? what ? sort of reports to be produced, in oder to present time and cost impact reports.
Please provide some advise with examples.
E-mail- azvips@hotmail.com [1]
Your prompt reply would be much help full.
Thank you very much.
MHM. Azvi
The cost of the project is one Billion US$, So far I have intensively involved in the progress that is site evaluating, monitoring and reporting. Project’s construction program being resources and cost loaded. Recently our client interested to measure the earn value through the P3, I have not so much idea how? what ? sort of reports to be produced, in oder to present time and cost impact reports.
Please provide some advise with examples.
E-mail- azvips@hotmail.com [1]
Your prompt reply would be much help full.
Thank you very much.
MHM. Azvi