To all experienced planners out there.....
i am always intrigued by a question as to how detailed should a programme be ? And to what level is a planning engineer required to prepare a programme...
For one of my recent projects i have prepared a rather detailed programme, however my project manager feels otherwise and wants me to break it further to the extent of working out the dates of each and every pile and each and every pile cap. Isnt this what a site engineer is supposed to be doing ?
On the contrary for another project of mine, my consultant wants me to prepare a programme which should be "not more than 3 pages". He is also against my dividing plastering activities floorwise..no a summarised (lower level) programme is not acceptable to him.
Hope someone of you will have a few tips of me...
Thanks
S.Deb
i am always intrigued by a question as to how detailed should a programme be ? And to what level is a planning engineer required to prepare a programme...
For one of my recent projects i have prepared a rather detailed programme, however my project manager feels otherwise and wants me to break it further to the extent of working out the dates of each and every pile and each and every pile cap. Isnt this what a site engineer is supposed to be doing ?
On the contrary for another project of mine, my consultant wants me to prepare a programme which should be "not more than 3 pages". He is also against my dividing plastering activities floorwise..no a summarised (lower level) programme is not acceptable to him.
Hope someone of you will have a few tips of me...
Thanks
S.Deb