Resources and curves

No replies
Muhammad Fiaz
User offline. Last seen 42 weeks 5 days ago. Offline
Joined: 7 Aug 2008
Posts: 11
How do we define resouces for Engineering work pack Manhours?.Do we define Labour resource (assign front loaded curve) and for cost/cash flow a non labour resource (assign backloaded curve)?
Similalrly for construction mostly we use trapezoidal curve for labour resource .Which curve do we assign to a cost/cashflow resouce(non labour)?
Could somebody reply?