5 replies [Last post]
magdy girgis
User offline. Last seen 7 years 14 weeks ago. Offline
Joined: 10 May 2004
Posts: 6
Groups: None
i need to use matrix repot to produce detailed report for budgeted cost ? please inform

Replies

Davide Catuzzato
User offline. Last seen 17 years 12 weeks ago. Offline
Joined: 3 May 2004
Posts: 10
Groups: None
Following Luca,

1st you should create a CBS, than you should integrate it with your code or cost account requirement.
If you don’t have to use a particular system I think excel can be properly used, throuht macro or sorting you can optain the needed roll-up.
If you need an XLS sample I can provide it.

ciao
Luca Basile
User offline. Last seen 9 years 11 weeks ago. Offline
Joined: 10 Jul 2003
Posts: 288
Groups: TILOS
See Davide which kind of cost matrix report.
Summarizing by cost accont and phases?
Or at which detail?
You canuse also report smith to do all this, or making an RA application.
Much easier link the P3 database with ODBC driver to excel or access make there your matrix reeport, with chart, pivot tables, etc ...
Davide Catuzzato
User offline. Last seen 17 years 12 weeks ago. Offline
Joined: 3 May 2004
Posts: 10
Groups: None
Could you specify what do you mean by matrix report ??
Do you have to use a particular system e.s. (Primavera or MS project ) or you are talking about a simple spread sheet?

If the second one is the case which one will be your detail?
magdy girgis
User offline. Last seen 7 years 14 weeks ago. Offline
Joined: 10 May 2004
Posts: 6
Groups: None
I have a Contract for a multi-story building and I need to produce a "Matrix Report" for the cost from the BOQ can you advise?
MK TSE
User offline. Last seen 3 years 46 weeks ago. Offline
Joined: 27 Feb 2002
Posts: 550
Groups: None
Would you mind details your requirement?
btw, is this question be under other forum?

PP Note, topic moved to Planning Forum