Change in original duration

Original duration in my baseline programme is of 1069 days. When i assign and maintain this baseline into a similar programme in which i am updating the progress, the original duration is changing to 1469 days. I believe the duration has to be the same as of baseline. 

FYI: The baseline start and Finish are intact but the problem is only with the duration.

Pls help