Primavera P6 training

Introduction to Primavera 6 R8.1 (P6 R8.1)

M
MQS S 👤 Member for 13 years 6 months

By the Introduction to P6 R8.1, we mean the basic understanding and procedures required to start up a new project in P6 R8.1. As we know that the P6 is one of the leading softwares in the world in the field of Project Planning and COntrol; it has some standard procedures of usage (i.e. steps to create a project). Although some the steps are not necessarily be inorder but some have to be. A detailed procdure has been given at QsArticle.Let us enlist some of the steps required to create a new project;

1) Primavera Products: