Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Site supervision

Technical Assitant, N.R.Loganathan & Co, Vellore, India, Residential projects in Chennai &Vellore, India.

START Date: 
May, 1994
END Date: 
July, 1995

Technical Assistant,

NR Loganathan& Co,

Technical Assistant, Corporation of Madras, Concrete and WBM road works in Chennai, India

START Date: 
August, 1995
END Date: 
January, 1996

Technical Assistant,

Corporation of Madras,

Concrete and WBM road works in Chennai, India

PROJECT ENGINEER, Fulton Hogan, Eastern Freeway Extension - Melbourne

START Date: 
January, 2004
END Date: 
May, 2005

Project Engineer

Fulton Hogan

Eastern Freeway Extension

 

  • Autonomous control of multiple areas of project works including RC structures, fabricated steel, drainage, and a wetlands construction.
  • Budgetary control and day to day coordination of works

Production Planning & Control Engineer, Grandspan Development Corporation, Coal-Fired Power Plant, Fly-over/Bridges, Metro Rail Stations, Commercial Buildings, Storage Tanks

START Date: 
December, 2003
END Date: 
April, 2005
• Understanding contractual obligations, project work scope, client requirements and specifications. • Creating WBS, BOM, estimating required resources and duration, and generating preliminary schedule and cost budget for approval. • Establishing schedule and cost baselines and performing work performance measurements throughout the project duration. • Preparing and distributing status reports (Gantt/milestone charts), performance reports and forecasts (S-curves). • Tracking and controlling shop drawing revisions and material availability and issuances. • Conducting routine shop walkthrou

Section Engineer - External Works, Consolidated Contractors Company CCC / HOCHTIEF (JV), Rafic Hariri/Beirut International Airport Rehabilitation and Extension

START Date: 
August, 1995
END Date: 
August, 1997

Duties include preparing reinforced concrete shop drawings and the related bar bending schedules; designing pre-cast elements for terminal buildings and got Dar Al-Handasah approval; supervising concrete works in Utility Tunnel, Terminal Building New Elevated Arrival/Departure Bridge, infrastructure works related to electrical airfield lighting for the new East and West Runways with their taxiways; supervising turnkey construction of two electrical substations and concertina fencing on top of Boundary Walls; handing over the Elevated Water Tank, Civil Aviation P

Site Enigneer, Carillion, Canary Wharf Station, Jubilee Line Extension

START Date: 
November, 1995
END Date: 
December, 1996

Site Engineer - Structures, Canary Wharf Station, Jubilee Line Extension.  Responsible for Concrete Slab construction at all levels of the Station

Site Enigneer, tarmac / Carillion, Various

START Date: 
September, 1993
END Date: 
November, 1995

Site engineer working on various road projects within the UK

Manager /Civil/ UT(Project Management Consultant), RITES Ltd, Construction of Airport Metro Express line for Delhi Metro.

START Date: 
June, 2008
END Date: 
May, 2010

July 2008 – May 2010    MANAGER in Airport Line Consultant (ALC)( A Joint venture of OC-PBI-JARTS-   TONICHI-RITES) engaged through RITES LTD, for the Construction of AIRPORT METRO EXPRESS LINE from NEW DELHI to Indira Gandhi International Airport- Dwarka Sec. 21, a prestigious project of Delhi Metro Rail Corporation Ltd of Phase II.

PROJECT ENGINEER / MECHANICAL ENGINEER, PMC - Adani Group, Industrial Project

START Date: 
December, 2006
END Date: 
May, 2009

Project :    Grain handling and storage project of Adani for FCI

Project :    Material Handling System, West port in Mundra,MPSEZ (Mundra Port & Special Economic Zone) Adani   Group(Gujarat)

Responsibilities:

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content