Primavera P3

Senior Planning Engineer, Saipem Spa, CONSTRUCTION FOR KASHAGAN OIL FIELD

START Date: 
March, 2006
Simone Gaeta +971506369821 simoneg1@mail.ru I worked in Italy, Kazakhstan and Dubai, always on site in any logistic, contractual and climatic conditions in Drydocks, prefabrication yards and Refinery. I had experience in train and lead junior planners (M/F) Italians and Internationals. I am willing to work worldwide

Senior Planner, Boland Payeh, Pardis Urea & Ammonia Petrochemical Plant; Zabol Cement Factory; Yazd Power Plant

START Date: 
June, 2004
END Date: 
January, 2009

Working as the Planner and Senior Planner in the following projects:

- Salman Farsi Storage Dam
- Assaluye Urea and Ammonia Petrochemical Complex
- Zabol Cement Factory
- Birjan BMI Main Building
- Yazd Power Plant
 

Planning Manager, ALSTOM Transport, Incheon Airport Railway Project

START Date: 
August, 2008
END Date: 
September, 2010

Incheon Airport Railroad Project, Korea

Developed Programme/Schedule:
Baseline Contract Schedule (Primavera P3)
Progress Monitoring Tools for Manufacturing & Delivery (Excel)
Progress Monitoring Tools for Installation (Excel)
Track Related Installation Programme (Excel)
Test and Commissioning Schedule (Primavera P3 & Excel)

Reporting:
Monthly Progress Report
Monthly Progress Presentation
Weekly Progress Report
Critical Path Analysis

I/E Planner, Redpath Engineering Services Ltd., Sable Island Gas Platform

START Date: 
July, 1998
END Date: 
July, 1999

I/E Planner for the construction of the Thebaud Topsides Facilities for the Sable Gas Platform at Kvaerner’s Port Clarence yard. Responsible for updating the P3 plans, cable schedules and job cards etc. to produce weekly productivity and progress reports by discipline.

Experience Hours (Planning & Scheduling): 
2000

PLANNING ENGINEER, Awal Building Contracting Co.LLC, 2 Nos. G+6 Buildings (Sharjah) Structural Steel (Fabricated) Factory at Umm Al Quwain Industrial Area

START Date: 
January, 2006
END Date: 
July, 2007

Job Responsibilities:

  • Preparation, submission and updating of the project master program
  • Recording progress of the project by comparing with the target project.
  • Submit weekly and monthly progress reports.

Projects:

  • 2 Nos. G+6 Buildings (Sharjah)
  • Structural Steel (Fabricated) Factory at Umm Al Quwain Industrial Area
Experience Hours (Planning & Scheduling): 
3000

Planner / Project Controller, GSK, GSK Block Drug Rationalisation

START Date: 
May, 2000
END Date: 
June, 2006

Project Description

To install additional capacity for, and transfer of, toothpaste & mouthwash production from 2 donor factories, to allow rationalisation, plus numerous smaller projects along similar lines.

Role & Responsibilities
Planning and reporting of installation works, enabling works (logistical process changes, toothpaste formulation development and product rationalisation), and managed transfer of production

Experience Hours (Planning & Scheduling): 
12000

Turnarounds Lead Estimator/Scheduler, BP North America, Alky, Coker, FCCU, Pipe Stills, Ultracracker etc. TAR's

START Date: 
December, 2010

Turnarounds Lead Estimator/Scheduler

 

Planner and Senior Planner, Tipakorn, Connecting Bangkok Southern Ring Road and Industry Ring Road

START Date: 
June, 2004

Created Baseline for Master Schedule and Narrative Schedule.

Writing Monthly Report and Monitoring Schedule.

Cost Estimate for Evaluated Sub Contractor and NewItem on Site.