Planning Engineer, Foster Wheeler, EQUATE – Ethylene Glycol Project

START Date: 
December, 1995
END Date: 
December, 1998

Planning Engineer :One of the key planners of the Project Control Team and responsible for Planning and Scheduling for the Ethylene Glycol Plant construction project being executed for EQUATE at Al Shuaiba, Kuwait.

Planning Engineer, Al Habtoor Engineering LLC, Several Projects

START Date: 
January, 1999
END Date: 
May, 2003

Planning Engineer :Doing Labour Costing for this project. Analyzing the effect of Labour Cost with the forecast and actual and reporting it to the project director weekly along with different histograms of manpower, steel and concrete. Updating a database prepared myself using MS Access to control the delivery of Concrete, Reinforcement and Precast. Using this report to compare the original invoice submitting from the sub-contractor for the preparation of Monthly Invoice.

Planning Engineer, Chiyoda Foster Wheeler Co, OMAN LNG Plant

START Date: 
June, 2003
END Date: 
December, 2003

Planning Engineer :Assist Chiyoda-Yokohama Project Control Team for finalizing Level III schedule for the submission to the client. At site, combined the Sub-Contractor’s schedule to prepare Level IV working schedule. Responsible for preparing Daily/Weekly/Monthly reports. Monitoring productivity, slippage of activities and reporting to the Controls Manager.

Schedule Controller, JGC Corporation, Upstream & Compression Facilities

START Date: 
February, 2004
END Date: 
November, 2004

Compile sub-contractor’s data and prepare Daily, Weekly and Monthly reports (Progress, Manpower and Equipment). Take the physical progress and compare with the sub-contractor’s reports. Update progress in P3 (Level III & Level IV). Prepare 3 Month, 3 Weeks Look-Ahead Schedules and monitor the productivity. Take progress photos and prepare the reports in PDF format (Acrobat).

Schedule Controller, ECC, Infrastructure Projects

START Date: 
December, 2004
END Date: 
November, 2006

Schedule Controller :Prepare schedule for new projects in Northern Iraq and implementing it. Responsible for preparing Daily / Weekly / Monthly reports, take physical progress and update the P3 schedule, based on the progress prepare invoice sheet for the client and subcontractor, monitor productivity, EVMS, CPA, EVA, slippage of activities and reporting to the Project  Manager. Prepare proposal schedules for the upcoming projects.Provide adequate training to nationals in Project Controls.

Sr. Planning Engineer, "ENI Oil, Libya", Onshore & Offshore Projects

START Date: 
January, 2007
END Date: 
March, 2009

Projects: Offshore :  DP3/DP4 Revamping Project,Bouri Field Gas Utilization Project (Sealine System),Gas Recovery Module for Bouri Field Gas Utilization Project, Basic Design and FEED- Bouri Field Phase 2 Development Project, Bouri Sloug Replacement Project, Acid Reinjection Project and Water Reinjection Project .

Project Controls, EG LNG (Marathon Oil Company), Onshore & Offshore Projects

START Date: 
April, 2009
END Date: 
October, 2010

Projects: Offshore :  Alba B Accommodations, Emergency Escape Bridge, Al B & B2 Fire & Gas Upgrade, Security Upgrades, Offshore Perimeter Surveillance Implementation. Onshore : Chemical Storage Warehouse, Malabo Dos, Overhead Gas Plant Integrated Project, Reliability Projects, Lightning Protection Project and Glycol Regeneration Project

Schedule Controller, ECC, Kabul Military Training Compound (KMTC)

START Date: 
December, 2010
END Date: 
July, 2011

Schedule Controller :Prepares and manages overall master project schedule integrating the project Work Breakdown Structure. Coordinates schedule from multiple contractors and incorporate the information gathered into the overall project master schedule. Monitors and forecasts progress of activities in contractors’ work schedules. Highlight problem areas and recommend remedial actions.

Planning & Project Controls Manager, Black & Veatch, Kandahar Helmand Power Project (KHPP)

START Date: 
August, 2011
END Date: 
May, 2012

Project Controls Manager :Mobilized to Afghanistan as Field Project Controls Manager for scheduling, cost engineering, and estimating functions for $266M USAID Kandahar Helmand Power Program. Projects include transmissions lines, distribution systems, substations, new power generation facilities (diesel generators), and hydropower turbine installation. 

planning engineer, dual construction, industrial

START Date: 
March, 2006
END Date: 
March, 2003

1.    Utilizing special planning computer software (Primavera Project Planner & Enterprise).

2.     Prepares baseline program and schedule based on the most appropriate method and sequence of construction operations of the project.

3.    Monitor and prepare different progress and forecast reports as needed by the management and/or client/consultants. (E.g. Look Ahead Schedule, Recovery Program)

Market Place