Head of Projects Planning & Control and Database Section, Petrobel (EGPC/ENI/BP), Oil and Gas On/Offshore development program of various sized projects

START Date: 
January, 2009
END Date: 
July, 2011

 

Head of Projects Planning & Control and Database Section

Petrobel Egypt (Oil & Gas Client/ENI & BP) – Cairo Head Office

 

The mission was to run & monitor the projects control system for a program of various sized On/Offshore Oil & Gas Projects respecting the shareholders targets & the company rules & procedures, the job responsibilities were mainly the following:

PROJECT ENGINEER, Trinetra Constructions, 1.Construction of Multistoried Buildings

START Date: 
November, 2001
END Date: 
January, 2011
PROFESSIONAL EXPERIENCE (10 YEARS)         

 

From July 2008 till date

 

ORGANIZATION     :TRINETRA CONSTRUCTIONS, Bangalore.

DESIGNATION         : PROJECT COORDINATOR.

PROJECT                  : CONSTRUCTION OF SERVICE CENTRE FOR INDIA

Planning and Project Control Chief Engineer, Snamprojetti and Persian Gulf Oil Company Consortium, Persian Gulf Oil Refinery

START Date: 
February, 2008
END Date: 
November, 2011

 

  • Scope definition of project in a EPC contract as a master scheduler
  • Consult with PM to bring fall behind project back on track
  • CPM scheduling, resource leveling, EV, SP, CP, TCPI, VAC and ETC calculation
  • Development of project planning and monitoring procedures and systems
  • Involve in project management office process and coordination
  • Project prediction based on analyze schedule progress and performance
  • Engineering and Construction coordinator
  • Associate with change order evaluations team and analyze r

Site Planning and Project Control Engineer, Foster Wheeler, GS, OIEC COnsortium, South Pars Gas Field, Phases 9 & 10

START Date: 
April, 2004
END Date: 
January, 2008
  • Site scheduler and project controller
  • Work with construction crew in order to prepare work front and look ahead plan
  • Assist with scheduling team to estimate and calculate activities duration and physical progress
  • Accomplishment as a qualified planner to reduce disordering between sub-contractors
  • Assist with PMO in fast tracking plans, catch up plans  preparation
  • Data gathering from construction team to prepare project progress reports
  • Update and Progress data bank to monitor the EPC versus baseline through S-curves

Claims Scheduler, Alpha Corporation, Miami International Airport Baggage Handling System

START Date: 
August, 2009

Scheduler tasked to review update schedules and project progress during the life of the project and addressing issues and potential claims. I also developed an Update Specific As-Built Schedule that displayed progress for all aspects of the project across all schedule update periods for claims analysis.

Project Planning & Project Control Engineer, EXPONENT ENGINEERS, HOZHU, MASCO, WARID TELECOM, Building, Oil Terminal, Sewage, Telecom, Water and Waste Water

START Date: 
December, 2005

Planning Engineer,

Major Responsibilites:

  • Preparing planning packages including WBS, all levels plan, prepared Critical path of the project.
  • Preparing master plan, base line plan , recovery plan, crush schedule,  and schedule for tender and insurance
  • Preparing Revnue cash flow , cost distribution and cash flow ‘S’ curve
  • Preparing resource loading, man power histogram and equipment list
  • Performing Earned value management for measuring project performances, cost analysis and future forecasts

Assistant to Contract Administrator, METIS CONSTRUCTION AND TRADE CO., Roads and Infrastructure Projects

START Date: 
September, 2007
END Date: 
April, 2008

Assistant to Contract Administrator

I worked together with the contract administrator to evaluate Potential risks for all upstream and downstream contracts of the company and we undertook correspondences of the company with the other contractual parties

Lead Schedule Engineer, Hyundai Construction & Engineering, Kuwait Pipeline Project (Sabiya-MAA, Kadma-Doha)

START Date: 
January, 2011

Lead Schedule Engineer

 

Kuwait Pipeline Project, Hyundai Engineering & Construction Company

 

Primavera P6, Auto CAD, MS Office

 

Scheduling, Reporting, Presentation.

Trainee Planner / Technical Assistant, QED International, BP Valhall Re-Development

START Date: 
October, 2009

I am currently being contracted through qedi to work on the BP Valhall Project as a trainee planner/technical assistant.

My duties are;

  • Compiling work packs
  • Communicating and working with the client and engineers
  • Entering jobcard data into GoPlan jobcard system
  • Entering activity codes into P6 then importing them to GoPlan to be attached with jobcards
  • Getting involved with the decision making for coding structures within P6 and GoPlan
  • Compiling weekly histograms/graphs to show progress with