Senior Project Control Engineer, Sacramento Regional Transit District, South Sacramento Phase 2 Light Rail Extension

START Date: 
October, 2009

South Sacramento Phase 2 Light Rail Extension Support ($270 million dollar project):

Cost Manager:

  • Producie Estimate at Completion Reports weekly sorted by Project Phase and Federal Transit Administration (FTA) required SCC Codes.
  • Produce Monthly Cost Reports that are provided to FTA Project Management Oversight Consultants.
  • Design and maintain Budget Change Database.
  • Produce detailed labor reports including trend analysis.
  • Produce Project and Contract Contingency Reports with T
Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
500

Planning, Cost & Project Controls, Atlantic, Gulf & Pacific Company of Manila, Various

START Date: 
November, 1981
END Date: 
April, 1991

Atlantic, Gulf & Pacific Company of Manila

1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.

Planning, Cost & Project Controls, Atlantic, Gulf & Pacific Company of Manila, Various

START Date: 
November, 1981
END Date: 
April, 1991

Atlantic, Gulf & Pacific Company of Manila

1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.

Planning, Cost & Project Controls, Atlantic, Gulf & Pacific Company of Manila, Various

START Date: 
November, 1981
END Date: 
April, 1991

Atlantic, Gulf & Pacific Company of Manila

1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.

Planning, Cost & Project Controls, Atlantic, Gulf & Pacific Company of Manila, Various

START Date: 
November, 1981
END Date: 
April, 1991

Atlantic, Gulf & Pacific Company of Manila

1981 to 1990 - Various positions from Cadet Engineer, Civil Engineer, Estimator II, Planning & Cost Engineer, Opcen Head, Resident Engineer, Site Representative. Work assignment from based in Makati City, Philippines; Bauan, Batangas; Kingdom of Saudi Arabia; Libya; Singapore; Hong Kong and Malaysia.

project manager, Project Time & Cost International Ltd, Sellafield LTP 10 assurance

START Date: 
January, 2008

I am responsible for leading and supporting the review and assurance of nuclear decommissioning, new construction and infrastructure projects ranging from a few £Ms to many £100Ms.

project manager, Project Time & Cost International Ltd, Sellafield LTP 10 assurance

START Date: 
January, 2008

I am responsible for leading and supporting the review and assurance of nuclear decommissioning, new construction and infrastructure projects ranging from a few £Ms to many £100Ms.

Planning, Estimating, Cost Control, Claims, OHL USA, Area wide

START Date: 
March, 2011

Project Coordination Manager

 

Planning, Estimating, Cost Control, Claims, Delay Analysis, P6, 

Planner / Scheduler, Turner Industries Group, L.L.C., Multiple clients

START Date: 
March, 2011

 P6 DBA / Currently I am setting up P6 for project management within our organization

Intermediate or Senior Planner, Makati Development Corporation, OIL REFINERY, -12 High Ends Residential/Condominiums Building Project

START Date: 
July, 2009

PLANNING - Initiates planning for Project Execution including preparations and presentations which includes overall detailed scheduling using primavera 6, formworks, concreting, & procurement schedule, breakdown of resources from approved BOQ then loads to resources in primavera, generates S-Curve, and other data formats which involves schedule and cost of the project as required by the Execution Team and Client.