Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Earned Value Management

Project Controls Lead, Camargo Correa, Unit Coke/HDT (Petrobras)

START Date: 
March, 2009
END Date: 
February, 2012

Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.

Experience Hours (Planning & Scheduling): 
7300
Experience Hours (Cost Management): 
7300
Experience Hours (Forensic Analysis): 
7300

Project Controls Engineer, Projectus Consultoria, Improvements Projects (Petrobras)

START Date: 
July, 2007
END Date: 
March, 2009

Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.

Experience Hours (Planning & Scheduling): 
4600
Experience Hours (Cost Management): 
4600
Experience Hours (Forensic Analysis): 
4600

Project Controls Engineer, Hatch, Alumar Alumina Refinery Expansion (Alcoa)

START Date: 
February, 2006
END Date: 
July, 2007

Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.

Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
3900
Experience Hours (Forensic Analysis): 
3900

Planning Technician, BECHTEL, Lycra SA-X4 (Dupont), Units DEA/TCR (Petrobras), Units UHDT/URFCC (Petrobras)

START Date: 
December, 2000
END Date: 
February, 2006

Planning and scheduling, cost estimating, earned value management, change management, cost controlling and risk management.

Experience Hours (Planning & Scheduling): 
12900
Experience Hours (Cost Management): 
12900
Experience Hours (Forensic Analysis): 
12900

Construction Planner and Scheduler, Halliburton-Kellogg Brown & Root (HKBR), Syncrude UE-1 Project

START Date: 
January, 2002
END Date: 
April, 2004

 

Experience Hours (Planning & Scheduling): 
3000
Experience Hours (Cost Management): 
950
Experience Hours (Forensic Analysis): 
700

3D / 4D Planning Engineer, National Grid UK, Electricity Transmission Substations and OHLs

START Date: 
November, 2010
END Date: 
March, 2017

·         Assured Contractor’s programme after contract awarded based on planning principles, Transmission Procedure 193, mandatory milestones, outages, links, budgeted cost and WBS mapping.

·         Ensured Contractor’s programmes are fit for NEC3 type of contract – Option A –E.

Experience Hours (Planning & Scheduling): 
14000
Experience Hours (Cost Management): 
4000
Experience Hours (Forensic Analysis): 
4000

Project Controls, Project Manager, PMA Consultants, Bayonne Bridge Navigational Clearance Program, Concerta Project

START Date: 
February, 2007
My main experience is in Inspection, Virtual Design & Construction, Project Management and Project Controls in Infrastructure, Pharmaceutical, Mixed-Used, and Tunneling; delivering projects from planning to project occupancy and operation. Experience in USA, Europe, Asia and the Caribbean. I performed cost and schedule risk analyses on more than 100 infrastructure and pharmaceutical projects, including tunnels, airports, bridges, roads, and ports totaling more than $35B.
Experience Hours (Planning & Scheduling): 
30000
Experience Hours (Cost Management): 
15000
Experience Hours (Forensic Analysis): 
1000

EVMS Specialist, Rolls-Royce Defence, PMO

START Date: 
May, 2012

Earned Value Management Systems (EVMS), Project Controls  and scheduling specialist.  Owner of Rolls-Royce Defence Earned Value Management System description.

Accountable for maintaining site compliance to EIA-748

First point of contact with US DoD Defence Contract Management Agency for all matters in relation to validation EIA-748 EVMS.

Internal Surveillance Audits against requirements of EIA-748.

Development and delivery of Project Management training with emphasis on Earned Value and Scheduling

Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
0

Project Controls Manager, iPlan, Consulting

START Date: 
October, 2013

Associate at iPlan Consulting.

Claims analysis

Project planning

Project controls management.

Senior Planning Engineer, Al HAMAD CONTRACTING COMPANY, Al Bareeq Tower @ Business Bay – Dubai - 5 Stars Hotel, BMW WORKSHOP & PARKING - Dubai, City Seasons Hotel (4 Stars) – Near Burjuman – Bur Dubai, Palmarosa Villas, Symphony Tower @ Business Bay – Dub

START Date: 
March, 2014
END Date: 
May, 2015

- Preparing and updating the project baseline / master program.
- Preparing tender programs.
- Assist in standard work break down and implementation of same to schedule.
- Ensure resource planning is done adequately and monitor and maintain resource levels and forecasts.
- Preparing progress S-curve (Time wise/Man-hours) and manpower histograms.
- Preparation of commodity charts and tracking with actual for close monitoring.
- Establishment of Progress Measurement System.
- Preparing weekly look ahead program as per the master program.

Experience Hours (Planning & Scheduling): 
2500
Experience Hours (Cost Management): 
2500
Experience Hours (Forensic Analysis): 
2500

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content