Cost

Senior Planning & Cost Control Engineer, Consultant, Refinery

START Date: 
June, 1980

Developing Project Schedule, Risk Analysis, Resourcing, Creating Earned Value Management systems, Claims and Analysis of schedule, Time Analysis, Variations & Claims Analysis.Etc

The Industries Worked in:

!. Petro-Chem - Refinary / Offshore  Platforms

2, Power Generation & Transmission

3. Water - Treatment & Desalination

4. Railway

5. Infra-Structure

6. Pharmaceuticals

Senior Planning & Cost Control Engineer, Consultant, Refinery

START Date: 
June, 1980

Developing Project Schedule, Risk Analysis, Resourcing, Creating Earned Value Management systems, Claims and Analysis of schedule, Time Analysis, Variations & Claims Analysis.Etc

The Industries Worked in:

!. Petro-Chem - Refinary / Offshore  Platforms

2, Power Generation & Transmission

3. Water - Treatment & Desalination

4. Railway

5. Infra-Structure

6. Pharmaceuticals

Senior Planning & Cost Control Engineer, Consultant, Refinery

START Date: 
June, 1980

Developing Project Schedule, Risk Analysis, Resourcing, Creating Earned Value Management systems, Claims and Analysis of schedule, Time Analysis, Variations & Claims Analysis.Etc

The Industries Worked in:

!. Petro-Chem - Refinary / Offshore  Platforms

2, Power Generation & Transmission

3. Water - Treatment & Desalination

4. Railway

5. Infra-Structure

6. Pharmaceuticals

Senior Planning & Cost Control Engineer, Consultant, Refinery

START Date: 
June, 1980

Developing Project Schedule, Risk Analysis, Resourcing, Creating Earned Value Management systems, Claims and Analysis of schedule, Time Analysis, Variations & Claims Analysis.Etc

The Industries Worked in:

!. Petro-Chem - Refinary / Offshore  Platforms

2, Power Generation & Transmission

3. Water - Treatment & Desalination

4. Railway

5. Infra-Structure

6. Pharmaceuticals

Consultant, CDP, Shipyard

START Date: 
September, 2011
END Date: 
February, 2013

Primavera Consultant - Providing instruction and consultanting for varying projects and industries.

senior planner; lead planner; project controls manager, SNC, & Various commercial

START Date: 
March, 1978

Senior planner in engineering, procurement and construction. Oil & Gas; Mining; Power Projects

Senior Project Coordinator, General Dynamics UK Limited, Various MoD (restricted information)

START Date: 
February, 2008
END Date: 
October, 2012

Manage and update Project Schedule with inputs from various discipline leads (Eng, Manufacturing, Procurement etc). Main activity takes place at month end, but ad-hoc updates happen throughout the month. Ensure Baseline is maintained

Ensure project schedule is uploaded into Oracle. Mainly for month end but also throughout the month to ensure booking numbers are open for people to book to

Ensure Cost Calculator is updated every month. Am point of contact / trouble shooter if Cost Calc goes wrong.

Experience Hours (Planning & Scheduling): 
4250
Experience Hours (Cost Management): 
4250

Project Control Manager, Saipem SpA, GNL3Z Arzew. Algerie

START Date: 
June, 2009

Project Control Manager at GNL3Z Arzew Project. 4Billion eueq, 15Million MHrs standard, 40Million MHrs Spent, 11k MPower, 800 project team members, 12 Project Management Team, 26 Project Control team members, 6 nationalities, 48 Months construction phase.

Senior Planning & Project Control Engineer, ConocoPhillips Indonesia, Onshore and Offshore

START Date: 
August, 2011
END Date: 
March, 2012

Responsibilities:

  • Develop planning and scheduling, progress measurement and progress reporting requirements and to incorporate them into the Tenders / Agreements (FEED, EPC)
  • Depth-in review and analysis of all submittals from contractors related to planning, scheduling, progress measurement, reporting, time analysis, project resource loading, critical path, productivity, compliance with work breakdown structure, production of 'what if scenario, individual plan to suit both COPI, BP Migas and Contractors, includes verification of

Project Controls (Budget/Schedule Engineer), Tefirom Group, Several Projects

START Date: 
April, 2011
END Date: 
September, 2011

- Take active role in tender stages of upcoming projects, analyzing the work schedule and technical details from a financial and commercial perspective, creating a budget plan which is dependent to duration and fiction of each single project.

- Analyzing the annual budget study and to determine if it is realistic, complete and cost-effective,

- Recommend on how the budget study could be improved to minimize waste and maximize efficiency,

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.
Syndicate content