Software Consultant (StruMIS.Net), AceCad Software (Australia) Pty Ltd., ERP / MIS Implemetation for Structural Steel Fabricators around the world

START Date: 
January, 2009
END Date: 
September, 2011

• Implement StruMIS.Net system (a steel fabrication management software harnesses work processes through the steelwork contract between departments, suppliers and clients; from estimate tendering, through procurement and production into construction. Project Progress Monitoring and Reporting).
• Prepare software training and installation guides, software specifications and software testing.
• Provide training to AceCad internal and international offices staff.

Senior Project Controller, OUTOTEC (Belo Horizonte, Guarapari, Rio de Janeiro) Brazil, Pelletizing Plant (SAMARCO), CSA Sinter Plant (Thyssen-Krupp)

START Date: 
October, 2006
END Date: 
November, 2013

planning and scheduling, budgeting, progress evaluation, re-scheduling, resource analysis, performance analysis, cost control, construction contract control, reports

Experience Hours (Planning & Scheduling): 
4200
Experience Hours (Cost Management): 
1200
Experience Hours (Forensic Analysis): 
600

Senior Project Controller, OUTOTEC CHILE LTDA, Construction & EPC projects (Fines Flotation plant, Crushing plant, Electrical sub-station/Transmision line, Electro-winning, Solving Extraction plant (VSF))

START Date: 
April, 1997
END Date: 
September, 2006

Project Controller (planning and scheduling, budgeting, progress evaluation, re-scheduling, resource analysis, performance analysis, cost control, construction contract control, reports, risk analysis) for EPC projects at mining industry

Skilled user of planning/scheduling tools (Primavera®, MS-Project®, @Risk®), spreadsheets, database software, SAP®user

Experience Hours (Planning & Scheduling): 
20800
Experience Hours (Cost Management): 
4950
Experience Hours (Forensic Analysis): 
1000

Project Controls System Support Manager, Bechtel, Houston Regional Office

START Date: 
June, 1992
END Date: 
June, 1993

Houston Regional Office; Responsible for support and coordination of all applications used by Project Controls such as Estimating, Cost Control, Scheduling, and reporting software. Established standards for application integration as well as training programs for these tools. Pioneered first multi user networks utilizing UNIX operating systems for Project Controls use.

Experience Hours (Planning & Scheduling): 
750
Experience Hours (Cost Management): 
750
Experience Hours (Forensic Analysis): 
500

Senior Planning Engineer, Abu Dhabi National Oil Company (ADNOC), Oil and Gas projects

START Date: 
July, 2005
END Date: 
December, 2010
Senior Planning Engineer Role includes Preparation of Project Master Schedules, Approve Baseline Schedules, Review Project Progress Reports and appraise Top Management on the status of the project. Review and approve Extension of Time claims and cost implications.

Regional Team Leader, AGL Pipelines, Goldfields Gas Transmission Pipeline

START Date: 
December, 1995
END Date: 
December, 1997

Pilbara Energy (PEPL) & Goldfields Gas Transmission Pipelines (GGT)

- Karratha Regional Team Leader

 

As the operator of the above pipelines, AGL Pipelines WA is required to maintain them to the highest standard. This is achieved through highly motivated multi-disciplined teams. As Supervisor of the Karratha team, I was responsible for the following:

 

·       Supervising pipeline commissioning activities

Experience Hours (Planning & Scheduling): 
650
Experience Hours (Cost Management): 
750

Lead Planning Engineer, Oilserv, UAE, EPC for Summail Gas Processing Facility Client: DNO.EP & Assembly- Design, Manufacture and Supply of Packaged Water Treatment and Disposal Plants- Client: BP,EPC - Bijell-1B EWT Facility Upgrade – MOL. EPC - Bakrman -

START Date: 
December, 2013
All the Projects Clients are in Iraq - BP, DNO, MOL. • Project Baseline Schedule preparation in Primavera 6.• Preparation of S Curve, Histograms, Budget, and Progress measuring system.• Updating of schedule on a weekly basis in Primavera 6.• Coordinating with the engineering crew to deliver the deliverables on time.• Keeping track of project on a daily basis.• Weekly and monthly reporting which includes cost reporting.• Bi weekly cost reporting.• Alerting the construction team of the ob
Experience Hours (Planning & Scheduling): 
3900
Experience Hours (Cost Management): 
1300
Experience Hours (Forensic Analysis): 
550

Assistant Manager - Project Controls, Climax Molybdenum, Construction of Water Treatment in Climax, CO

START Date: 
October, 2011
END Date: 
May, 2015

Provided project controls and accounting for a $250 MM water treatment facility at the molybdenum mine in Climax, CO.

Project Controls included contractor compliance and performance audits, schedule adherence, monthly equipment audit

Project accounting consisted of forecasting, monthly reporting, journal entries, contractor accruals, invoice auditing and budgeting.

Experience Hours (Planning & Scheduling): 
500
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
500

Offsite Project Execution Coordinator, Kayson, 10,000 unit-housing project

START Date: 
May, 2009
END Date: 
October, 2009

Main officer for 10,000-Unit housing Project (Offsite works) responsible of organizing and maintaining the best integration between scheduling, cost control and Risk Management functions. Duties included:

Experience Hours (Planning & Scheduling): 
50
Experience Hours (Cost Management): 
50
Experience Hours (Forensic Analysis): 
50

Project Quantity Surveyor , Contracting & Construction Enterprises Ltd., SAUDI RAILWAYS ORGANIZATION (SRO)Riyadh City, KSA: RUNNING REPAIR SHED, HEAVY REPAIR WORKSHOP

START Date: 
July, 2012
END Date: 
July, 2013

·         Prepared detailed takeoffs from division 2 to division 13.

·         Advised and coordinate the procurement Engineer on procurement strategy.

·         Prepared a cost price breakdown for a new works not included in the BOQ.

·         Revised cost price breakdown for potential savings.

Experience Hours (Cost Management): 
14000

Market Place

See how the TIME - LOCATION - VIEW brings clearness to your work programmes
Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher and PMI accredited REP. Teach yourself using on-line or book based learning or run your own in-house or public PMI accredited courses.
For 25+ years, APMX has been providing competency based project management training to Fortune 500 companies around the world, applying the principles of project based learning, designed to produce measurable results, generating a favorable “return on training investment”.
Syndicate content