Planner Engineer, CCE - Contracting & Construction Enterprise Ltd., SADARA Poly Ethylene

START Date: 
December, 2012

RESPONSIBILITIES
● Prepare and update project schedule based on the contract. 
● Set work program and target milestones for each phase based on the project plan.<

Planner Engineer, CCE - Contracting & Construction Enterprise Ltd., SADARA Poly Ethylene

START Date: 
December, 2012

RESPONSIBILITIES
● Prepare and update project schedule based on the contract. 
● Set work program and target milestones for each phase based on the project plan.<

Planner Engineer, CCE - Contracting & Construction Enterprise Ltd., SADARA Poly Ethylene

START Date: 
December, 2012

RESPONSIBILITIES
● Prepare and update project schedule based on the contract. 
● Set work program and target milestones for each phase based on the project plan.<

Senior Planner, Naseria Contracting, 1. G+5P+Activities Floor+33 Twins Typical Floors High Rise Building Construction of Manazil Tower Five at Sharjah - UAE

START Date: 
April, 2008
END Date: 
July, 2012

 

WORK EXPERIENCE

2008-2012         Naseria Contracting Establishment – Senior Planning Engineer             UAE                                                                       

Construction Project Planner / Senior Planner, "Haif Construction Co.,Saudi arabia", 1) Infrastructure 2) Sewerage Treatment Plant 3) Bridge works 4)Building works

START Date: 
May, 1994

- Preparing Construction Schedule at Bid Submission Stage.

- Preparing Detailed  Implementation Schedule (After Contract award).

- Preparing CPA (Critical Path Analysis) & Baseline Schedules.

- Developing Manpower histogram & Other Progress Tracking, “S” curves.

- Reporting Delay & Claims.

- Dealing  with Scope changes/Variances.

PCM or Senior Planning Engineer, (A local Pvt. Ltd. Company), & Various commercial

START Date: 
January, 1998

Al koor and al dakera vilage renovation :PCM

Labor city :PCM

Al karanaa vilage renovation  :PCM

Um sulal vilage renovation : PCM

Ras ushairage vilage renovation : PCM

mega water tanks :PCM

 

Lead Planner, OPG, Pickering A Restart and Safe Storage

START Date: 
August, 2001
END Date: 
June, 2007

Lead planner for retrofit of two nuclear reactors and mothballing two others.

Application Engineer / Planner / Primavera Application / Trainer, Consolidated Construction Consortium Limited, Planning for infrastructure projects

START Date: 
December, 2007
END Date: 
November, 2012

 

Planning Engineer 

.Analysis of tender information and review tender programmes before submission.

·Review and understand the scope of works through drawings post award of contract.

·Discuss with site team for realistic production rates and resource levels for the works being undertaken. Understand the site constraints and logistics. Discussion with all departments such as Design, M&E and sub-contractors in order to produce a fully coordinated plan.

Construction & Commissioning Engineer, Silungisa Projects, Durban 2010 Soccer World Cup Stadium

START Date: 
March, 2006
END Date: 
September, 2010

Installation of Steel Structures, Cable Structures and Membrane Roof for Pfeifer Seil und Hebbe Technik at the Moses Mabhida 2010 FIFA world cup stadium.

Erection of Tensile Structures for MTT. Site survey. Selection and qualification of sub-contractors. Site establishment, civil works, utility supply, building work, rigging, equipment installation and site acceptance.