/ Construction Project Planner / Senior Planner / Forensic Analyst, Midgard Ltd, North Wharf Gardens project, 335 high-end residential flats, gym and retail areas (£170M)

START Date: 
January, 2017
Senior PlannerFulham Riverside Phase 2 Project, 161 assisted living accommodation and amenity spaces (Pool, spa,restaurant and bars) (£90M) Liaised with external contractors and suppliers to organize the phases and implement a robuststrategy; achieved successful completion of the project milestones within set timeframe andbudget Coordinated with clients and their representatives (architects, engineers and surveyors, Planner);chaired meetings to inform on progress Establish construction project and m
Experience Hours (Planning & Scheduling): 
24000
Experience Hours (Forensic Analysis): 
500

/ Construction Project Planner / Senior Planner / Forensic Analyst, Pertamina EP, Gas Engine Generating Set Project

START Date: 
July, 2015
END Date: 
May, 2017

Gas Engine Generating Set Project is made for solve the electrical transmission problem because of subsea cable is hit by an anchor. Subsea cable repair planning doesn't execute because of new government regulation which state that new cable is prohibited to lay on riverbed.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
1850

/ Construction Project Planner / Senior Planner / Forensic Analyst, PT. Pertamina (Persero), Asset Integrity Projects

START Date: 
August, 2019

Now my task is Asset Integrity System that set up to standarize integrity system on Pertamina Upstream subsidaries company that consist of various capacity production, background and located on scatter area of Indonesia.

Asset Integrity System that will built have key performance that must achieve and monitored regularly and will visualized on Integrity Dashboard which will be monitored by Upstream Director. Integrity performance of subsidary company can compare each other so we know which the best and the worst performance.

Experience Hours (Planning & Scheduling): 
900
Experience Hours (Cost Management): 
500
Experience Hours (Forensic Analysis): 
1000

/ Construction Project Planner / Senior Planner / Forensic Analyst, Pertamina EP, Offshore Power Plant

START Date: 
July, 2015
END Date: 
December, 2017

On Offshore Gas Turbine Generator Set Project, I joint on mid of construction work. The project scope is to decommissioning the existing generator set and to construct 4 set new Gas Turbine Generator System complete with panel control set. The obstacle is limited space and no stop oil and gas production operation.

To solve problem limited space, we choose the GTG with big capacity and small size. For no stop production operation, we use external power plant that we set up the generator set on the barge with subsea cable. That condition will make the problem if the weather is bad.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
2000

/ Construction Project Planner / Senior Planner / Forensic Analyst, Atkins Faithful & Gould, Jumaira Towers,

START Date: 
September, 2019

Experienced project planner responsible for plank my and control for many construction project from initialb stage to hand over stages in Ddefrent type of procument including Forensic analysis including project management performance for remixed used projrojects Schools, etc. In UK, Middleast, Atrica

Experience Hours (Planning & Scheduling): 
39900
Experience Hours (Cost Management): 
18400
Experience Hours (Forensic Analysis): 
11000

/ Construction Project Planner / Senior Planner / Forensic Analyst, CPB Contractors (part of CIMIC Group, Australia), Multiple Tenders

START Date: 
March, 2018
END Date: 
June, 2019
He was part of tenders team and worked on many major project tenders in New Zealand, and his main responsibilities are discussed below:- Responsible for developing L3/L4 tender programmes along with cost and resource loading, and also developing various histograms for the same.- Coordinating with project engineers and project managers for programme inputs and also to give and take inputs on construction methodology and sequencing.- Present programme during programme review and tender review meetings.- Coordinate with estimators
Experience Hours (Planning & Scheduling): 
2100
Experience Hours (Cost Management): 
350
Experience Hours (Forensic Analysis): 
200

/ Construction Project Planner / Senior Planner / Forensic Analyst, Bateman Africa, BSGR Guinea Iron Ore Extraction Project

START Date: 
July, 2009
END Date: 
September, 2009

BATEMAN Africa (01/07/2009-25/09/2009)

SENIOR PLANNER

 

BSGR Guinea project (Feasibility Study)

 

n  Schedule the feasibility study activities for all the consultants on the study.

n  Integrate the budget and the schedule using the WBS and CBS to forecast a reliable cash flow for the execution phase.

n  Manage the master schedule for Bateman.

n  Maintain sub consultants schedules and report on earned value.

n  Attend progress meeting with the client (BSGR).

Experience Hours (Planning & Scheduling): 
100
Experience Hours (Cost Management): 
50

/ Construction Project Planner / Senior Planner / Forensic Analyst, Carrilion, Residencial

START Date: 
January, 2016
END Date: 
July, 2019
I develop tools and templates to support project team, gather information and implement quality criteria to ensure cost effectiveness and lessons learnt and Preparation of baseline construction program at the tendering stage and detailing of the same and Assisting that ensuring jobs are completed to the required timescales